DATE: April 15, 2020, WED.
PART ONE OF TWO.
PAI PIN CHEN, INTERNET.
NYSEASIA@GMAIL.COM.
Philip Pai-Pin Chen, P.E. (New York,USA)
PAI PIN CHEN, INTERNET.
nyseasia@gmail.com;nyseasia@hotmail.com.
陳栢彬,陳柏彬
請您和大家非常注意照顧自己有關方面的問題.
感謝感恩.
謝謝.
愉快.
Professional Experience:
T. Tower II ( COMING PROJECT, PERHAPS).
Operation and maintenance Manual
____________________________________________________ PHILIP PAI-PIN CHEN, P.E.
Trade:I. Electrical
1. Substation
2. Power
3. Lighting
4. Standby
Generators
5. Control
and Monitoring System
6. Telephone
7. Broadcasting
8. CCTV
9. UPS
10.
Fire Alarms
11.
The others
II. Plumbing
1. Domestic
Water
2. Sewage
3. Sanitary
4. Air-Compressor
and air system
5. Boiler
and steam piping
6. Piping (Gas related)
III. Fire Protection
1.Hydrant
2.Sprinkler
3.Foam
4.Co2
5.Halon
IV. HVAC
1. Air-Duct
2. Piping
3. Cooling/Refrigeration
4. Air-purification
5. Acoustic/Earth
-Quake protection
6. Constant-Temp.
& Humidity system
FILED.
TWO OF TWO.
DATE: APRIL 9TH., 2020, THURSDAY.
Philip Pai-Pin Chen, P.E. (New York,USA)
PAI PIN CHEN, INTERNET.
nyseasia@gmail.com;nyseasia@hotmail.com.
陳栢彬,陳柏彬
請您和大家非常注意照顧自己有關方面的問題.
感謝感恩.
謝謝.
愉快.
Professional Experience:
*傳道尖端科技股份有限公司
* Power Chen & Associates, Inc.
* MCTI, Power Group (New York, USA)
Mission Critical Technologies,Inc. Pacific Rim , Asia
*李祖原建築師事務所(台灣台北市)
C.Y.Lee & Partners, Architects (Taipei, Taiwan).
*中國技術服務社,中鼎顧問工程股份有限公司(台灣台北市)
China Technical Consultants, Inc (Taipei, Taiwan).
* Syska & Hennessy, Consulting Engineers. (NYC, USA),
希斯卡與瀚尼斯,顧問工程股份有限公司(美國紐約市)
* Jaros, Baum &Bolles, Consulting Engineers. (NYC, USA)
嘉洛士, 包畝 與 播魯士,顧問工程股份有限公司(美國紐約市)
* Caretsky & Associates, Consulting Engineers. (New York, USA)
卡雷司基,顧問工程股份有限公司(美國紐約市)
*中興電工機械股份有限公司(台灣,中和)
Chung Hsin Electric & Machinery Co.Ltd.(Taiwan)
___________________________________________________________
Area & Work Reached: Since 1972 up to date
1. ADSC: Area Development Service Center, New York Connection
West meet East with language & Culture (on going project)
2. Taichung Tower II , 47 floors high rise building on construction stage,
“Field Observation & report”
3. Culture Village, Chang Hua, Taiwan
Large area developed for playland with rides/ shows/ attractions/
Food/ refreshments/ games/ etc.
4. Far-Eastern Plaza, Taipei, Taiwan:
Partial Project Coordination.
5. Cogeneration power plants Promotion Task Force:
Approx. 120 cogenerator units could be installed in Taiwan
And may produce 350MW electricity.
6. E.R. Squibb & Sons, Inc.Lawrenceville, New Jercy, USA:
Large high-tech Building complex and labortory, 10MVA
Central utility power plant and associated distribution.
7. Goldman Sachs & Company, Broad Street, New York, USA:
10MVA electrical system and super-computer data center
8. IBM Customer Executive Education Center, Palisades, New York:
Building complex/Office + Show Room+Computer data Center
+Class Rooms+Studios+Hotel
9,000KVA Electrical System /Three Unit Sub-Stations
9. Morgan Bank, New York City, U.S.A:
60 Floors intelligent office building for banking and trading.
10. Burroughs-Wellcome, Greenville, North Carolina, USA:
15MW Cogeneration power plant parallel with Electrical
Power company.
11. Power Station-Rikers Island, New York City, USA:
27KV/4160V newly built utility power substation
12. ITT Building, 52nd.Street,New York city, U.S.A:
47+ Floors Building, Mech. and Electrical load analysis
For Renovation
13. Super computer data center, GS&Co.Broad Street, NYC:
7th. & 8th. Floors computer data center with 1,450KW
UPS System and associated mechanical system.
14. Super Computer Data Center,GS&Co. Brooklyn,USA:
4,000KW UPS and Mech.System.
15. 7 Hanover ,Low Manhattan,USA:
37th.floors building with trading floors
16. Operation Station, Cambridge,Mass.,USA:
Mech. & Elec. System for Station Operation.
17. Swiss Bank,New York City,USA:
Dedicated computer data center for banking and trading.
18. Bankers Trust, Large Computer Data Center,NYC,USA:
UPS System Function Analysis
19. Chemical Bank,Water Street,NYC,USA:
3,000KW UPS System Function Analysis (Wo.R.)
20. Bank Of China,Hong Kong, China:
87 floos building designed by Mr. I.M Pei And Parters,Architect
Electrical Distribution System:11KV-Primary/346/200V.
2,000KVA,1,500KVA,1,000KVA,and 750KVA Unit
Substations located on certain mechnical floors
21. 599 Lexington Avenue,New York City,USA:
The 72 Floors high rise building/each floor provided with Own
metering devices.
22. Irving Trust Bank,New York City,USA:
Large Computer Dater Center with 3,000KW UPS
Electrical Distribution-5KV Primary/480/277V Secondary.
High-Tech. Intelligent Building
23. American Broadcasting Company, Studio 23/24,NYC,USA:
Heavy Lighting System with dedicated control system.
24. Power Co. Sub-station-50 MVA/110KV/13.8KV.
Double-Ended Unit Sub-stations-30 MVA Total
Gas Turbine Type Emergency Power system-25MW.
25. Pitney Bowes,Headquater,Connecticut,USA:
Building designed by I.M.Pei And Parters, Electrical Load-4,000KW
26. Philip Morris Inc.,42nd.Street,New York City,USA:
36 floors building,Electrical Load-5,000 KW.
27. General Services Administration,PBS,Washington,DC:
Public Services Building-Electrical Load Over 10MW.
28. Technical Facility,Headquarter Complex, The Coca
Cola Conpany ,Atlanta,Geogia,USA
Electrical Load-9,000 KW
29. Office Building,Coca Cola Company,Atlanta,Geogia,USA
Electrical Load-8,000KW
30. Morgan Guarranty Trust Co.,TennantsFloors, NYC, USA:
Tennant Floor Renovation for offices in downtown area.
31. Sears Tower , 36th. Floor, Chicago, USA
Mech. & Elec. System Renovation
32. New York Hospital,(Generator Plant Modification)
33. New York Hospital,(Partial Mechanical Room Renovation)
34.重要建築物與設施
Filed.
No comments:
Post a Comment