I AM GETTING BETTER AND I HOPE FEW MORE MONTHS COMING WITH THE MEDICAL DOCTORS SERVICE, WEST STYLE AND CHINSE TRADITIONAL STYLE.
HIGHLY APPRECIATED.
PAI PIN CHEN.
MARCH
8, FRIDAY, 2019.
TODAY,
WOMEN’S FESTIVAL, IN TAIWAN, REPUBLIC OF CHINA, SINCE YEAR 1949.
MOST
THANKFUL.
I.
ALSO,
TODAY, MY CHINESE TRADITIONAL MEDICAL HOSPITAL, HONGHUA, THE DOCTOR ASKED ME TO
STARTED STARTING MY CONCERS REGARDING THE BRAND NEW, NON- TOUCHED, TOUCHING
ABOUT THE NUCLEAR NO. FIVE(5), POSSIBLE LOCATED IN TAIWAN SOMEWHERE , IN
REPUBLIC OF CHINA, AND THE TOTAL COST ABOUT NTS. 6000/7000 BILLIONS TAIWAN DOLLARS, ABOUT 20 BILLIONS US
DOLLARS, 23 BILLIOONS US DOLLARS.
II.
II.
I AM PAI-PIN CHEN, P.E., I RESPONSED TO THIS WONDERFUL CHINESE MEDICAL DOCTOR,
I DID’T SAY NO TO HIM.
III.
OK.
SEE IN YEARS 2020, 2021 AND SEE THE PRIMARY KEY LEADERS WHST HE, SHE, OR THEY
WANT TO DO ABOUT THIS VERY SPECIAL EXTREMELY SUPER LARGE PROJECTS, AND THE KEY
NATIONS RELATED, RELATING TO THIS PROJECT WILL BE, SHOULD BE, SHALLBE FRANCE,
USA, JAPAN, KOREA, ETC.
IV.
THANK
YOU VERY MUCH FOR ALL.
V.
THANKS
TO MICROSOFT COMPANY, AND GIVE, GIVING GOOD CHANCE TO POSTING MY PHOTOS, IMAGES
WHICH TI TOOK IN YEAR AROUD 1982, IN LOW MANHATTAN, DOWNTOWN, SEE THE FIVE
PHOTOS, SPECIAL BUILDING/TOWER, OFFICIAL,NYC, NY, USA.
VI.
OKAY.
THANK
YOU VERY MUCH.
P3
OF 7.
(1)
Studies-Engineer will study The following alternative Systems including
advantages, Disadvantages, budget cost And recommendations. -HVAC (INCLUDING
CENTRAL PLANTS) (LIST) -ELECTRICAL (List) -SANTARY
P3
OF 6,(List) -VERTICAL TRANSPORTATION (List) -FIRE AND LIFE SAFETY (List)
-SECURITY (List) -COMMUNICATIONS (i.e., data, etc.) (List) -Other Notes: (a)
Recommendations for further studies In subsequent studies in subsequent Phases
of project. (2) Survey of existing facilities and conditions and report of findings.
(3) Verification of accuracy of drawings or other information furnished by
owner. (4) Design Criteria including applicable codes and standards, and
systems descriptions. (5) Space conditions and weights for M/E and other
applicable trades equipment. (6) Outline Specifications. (7) System Flow and/or
Riser Diagrams, block layouts of M/E and major spaces. (8) Part or full typical
floor layout for: -HVAC -ELECTRICAL -SANITARY -FIRE PROTECTION (9) Major
equipment sizing. (10) Discussions and confirmation With applicable public
agencies And utility companies concerning Project and services. Note: This
should be specifically Discussed with client since on some Projects (especially
in the Schematic Design Phase) we are directed not To contact anyone regarding
the Project. (11) Preparations of estimated Construction costs on a square foot
Basis. (Note: This may be provided by Engineer, Construction Manager, General
Contractor Or Cost Consultant. )
b.
Design Development Phase
(Based
on Approved Schematic Design Phase) * (1) Additional Studies for: -HVAC (List)
-Electrical (List) -Sanitary (List) -Vertical Transportation (List) -Automation
(List) -Fire and Life Safety (List) -Security (List) -Communications (List)
-Other (List) (2) Outline Specifications (if not furnished During Schematic
Phase) or first pass Using final specifications. If final Specifications are to
be used, verify format. (3) Updated drawings confirming space Conditions,
weights, equipment and system Sizing and selection. (4) Updated Design Criteria.
(5) Updated utility information. (6) Updated estimated construction costs.
(Note: This may be provided by Engineer, Construction Manager, General
Contractor Or Cost Estimator.)
c.
CONSTRUCTION DOCUMENT PHASE (Based on approved design development Phase)
*
(1) Additional Studies for: - HVAC (List) - Electrical (List) - Sanitary (List)
- Vertical Transportation (List) - Automation (list) - Fire and Life Safety
(List) - Security (list) - Communications (List) -Other (List) (2) Final
Specifications and
P3
OF 7.
No comments:
Post a Comment