ieee.mobi,leee.mobi,NYSEASIA.com,Good days worldwide

June 8th.,2010

Say Hi!

Nice everyday!

Ieee.mobi,PPC,P.E.
SFL,leee.mobi
Mission Critical & Essential.com
Music Essential,Broad,Worldwide
Dot,Optical,Pacific Rims, A+A,Worldwide

Friday, March 8, 2019

IN, DURING THE LAST THREE(3) MONTHS, THE TRADITIONAL CHINESE MEDICAL DOCTORS TAKE CARE ON MY PARTIAL PHYSICAL PROBLEMS. OK. NOW.

THANK YOU VERY MUCH.
I AM GETTING BETTER AND I HOPE FEW MORE MONTHS COMING WITH THE MEDICAL DOCTORS SERVICE, WEST STYLE AND CHINSE TRADITIONAL STYLE.
HIGHLY APPRECIATED.
PAI PIN CHEN.

MARCH 8, FRIDAY, 2019.

TODAY, WOMEN’S FESTIVAL, IN TAIWAN, REPUBLIC OF CHINA, SINCE YEAR 1949.

MOST THANKFUL.

I.                   ALSO, TODAY, MY CHINESE TRADITIONAL MEDICAL HOSPITAL, HONGHUA, THE DOCTOR ASKED ME TO STARTED STARTING MY CONCERS REGARDING THE BRAND NEW, NON- TOUCHED, TOUCHING ABOUT THE NUCLEAR NO. FIVE(5), POSSIBLE LOCATED IN TAIWAN SOMEWHERE , IN REPUBLIC OF CHINA, AND THE TOTAL COST ABOUT NTS. 6000/7000  BILLIONS TAIWAN DOLLARS, ABOUT 20 BILLIONS US DOLLARS, 23 BILLIOONS US DOLLARS.

II.                II. I AM PAI-PIN CHEN, P.E., I RESPONSED TO THIS WONDERFUL CHINESE MEDICAL DOCTOR, I DID’T SAY NO TO HIM.

III.             OK. SEE IN YEARS 2020, 2021 AND SEE THE PRIMARY KEY LEADERS WHST HE, SHE, OR THEY WANT TO DO ABOUT THIS VERY SPECIAL EXTREMELY SUPER LARGE PROJECTS, AND THE KEY NATIONS RELATED, RELATING TO THIS PROJECT WILL BE, SHOULD BE, SHALLBE FRANCE, USA, JAPAN, KOREA, ETC.

IV.             THANK YOU VERY MUCH FOR ALL.

V.                THANKS TO MICROSOFT COMPANY, AND GIVE, GIVING GOOD CHANCE TO POSTING MY PHOTOS, IMAGES WHICH TI TOOK IN YEAR AROUD 1982, IN LOW MANHATTAN, DOWNTOWN, SEE THE FIVE PHOTOS, SPECIAL BUILDING/TOWER, OFFICIAL,NYC, NY, USA.

VI.             OKAY.



THANK YOU VERY MUCH.

P3 OF 7.

(1) Studies-Engineer will study The following alternative Systems including advantages, Disadvantages, budget cost And recommendations. -HVAC (INCLUDING CENTRAL PLANTS) (LIST) -ELECTRICAL (List) -SANTARY

P3 OF 6,(List) -VERTICAL TRANSPORTATION (List) -FIRE AND LIFE SAFETY (List) -SECURITY (List) -COMMUNICATIONS (i.e., data, etc.) (List) -Other Notes: (a) Recommendations for further studies In subsequent studies in subsequent Phases of project. (2) Survey of existing facilities and conditions and report of findings. (3) Verification of accuracy of drawings or other information furnished by owner. (4) Design Criteria including applicable codes and standards, and systems descriptions. (5) Space conditions and weights for M/E and other applicable trades equipment. (6) Outline Specifications. (7) System Flow and/or Riser Diagrams, block layouts of M/E and major spaces. (8) Part or full typical floor layout for: -HVAC -ELECTRICAL -SANITARY -FIRE PROTECTION (9) Major equipment sizing. (10) Discussions and confirmation With applicable public agencies And utility companies concerning Project and services. Note: This should be specifically Discussed with client since on some Projects (especially in the Schematic Design Phase) we are directed not To contact anyone regarding the Project. (11) Preparations of estimated Construction costs on a square foot Basis. (Note: This may be provided by Engineer, Construction Manager, General Contractor Or Cost Consultant. )

b. Design Development Phase

(Based on Approved Schematic Design Phase) * (1) Additional Studies for: -HVAC (List) -Electrical (List) -Sanitary (List) -Vertical Transportation (List) -Automation (List) -Fire and Life Safety (List) -Security (List) -Communications (List) -Other (List) (2) Outline Specifications (if not furnished During Schematic Phase) or first pass Using final specifications. If final Specifications are to be used, verify format. (3) Updated drawings confirming space Conditions, weights, equipment and system Sizing and selection. (4) Updated Design Criteria. (5) Updated utility information. (6) Updated estimated construction costs. (Note: This may be provided by Engineer, Construction Manager, General Contractor Or Cost Estimator.)

c. CONSTRUCTION DOCUMENT PHASE (Based on approved design development Phase)

* (1) Additional Studies for: - HVAC (List) - Electrical (List) - Sanitary (List) - Vertical Transportation (List) - Automation (list) - Fire and Life Safety (List) - Security (list) - Communications (List) -Other (List) (2) Final Specifications and

P3 OF 7.

No comments:

Post a Comment