P2
OF 7.
TODAY:
MARCH 4TH., MONDAY, 2019.
I.
THE
FOLLOWING IP .US, MIGHT BE DELETED IN THESE YEARS.
“Happy
birthday. I. ArchitectureEngineering.us II. ArchitectureEngineering.us
Registered on March 3, 2015. PAGE ONE OF SIX.”.
Highly
appreciated.
II.
I
AM CONSIDERING MY EXPERIENCES WHILE I WAS ABOUT 3 YEARS OLD, 5 AND HALF YEARS
OLD, AND DURING MY AGES ,12, 13, AND 14 YEARS OLD.
III.
IN
THE LAST THREE MONTHS, I WAS, AM TAKING MY PHYSICAL PORTION OF MY BODY, RIGHT
SIDE BACK, INCLUDING THE CENTRAL , CENTER PART, AND THE BOTTOM OF MY BODY AND
THE ENTIRE RIGHT FOOT, UP TO TODAY, AND COMING SEVERAL MONTHS, DUE MY PHYSICAL
PORTION RIGHT BODY WITH MY RIGHT FOOT BEEN HEART ONE OR SEVERAL TIMES AT MY AGES 12/13/14 ,BY WAS CARRING
NATURAL DRINKING WATER, WITH TWO HEAVY TANKS ON MY RIGHT SHOULDER, AND CARRIED
BACK TO MY HOME OF MY FAMILY ,THE DISTANCE ABOUT 500 METTER BETWEEN THE
HYDROLOC NATURAL WATER TOWER AND MY OLD HOME FACILITY .
IV.
SEE
WHAT WILL BE POSTED VIA MY MEDICARE SUPPORT FROM THE FAMOUS DOCTORS OF
HOSPITALS NOW AND COMING DAYS, MONTHS ,THIS YEAR 2019.
V.
SEE
!
THE
PAGE TWO OF SEVEN(7) PAGES AS SHOWN BELOW.
THANK
YOU VERY MUCH.
PAI-PIN
CHEN, P.E.
JAROSBAUMBOLLES.COM.
PHILIP
PAI-PIN CHEN, P.E.
SYSKAHENNESSY.MOBI
NYSEASIA.US
NYSEASIA.TV.
PAIPINCHEN.COM.
1.
The one of the many items following, I will, may, might be involved in the year
2016, Mid Term, 2016, 2017 and coming years.
2.
In 2015, I won’t work on the fields as I preferred due the location, space I
stay, staying, and stayed still not passing the “law” let me can applied my LICENSE
NUMBER 60513,PAI-PIN CHEN, SINCE 1988 in Taiwan.
3.
Today, March 4, 2015, I need to work on step by step and back to Manhattan, New
York City, USA and see what I can do if I like to do something I enjoy doing
it.
4.
More to be posted.
DRAFT:
Revised and updated required.
ATTN:
PLEASE
CONTACT ME, PHILIP PAI-PIN CHEN, SHOULD YOU INTEREST IN THE PROJECTS EXISTING,
EXISTED, OR NEW COMING IN YOUR TERRITORITIES. YOU CAN REACH ME: VIA:
nyseasia@gmail.com.
Thank
you very much. Phil.
What
about: concern you, concern me and us; good with you all, al time.
CONTRACT
CHECKLIST (Not for Construction).
The
numbering systems need to be revised for easy reading and for official
purposes.
"sorry,
i will fix and re-numering in he later time or dats for you and myself"
OK!,
bear with me at this moment-PAI-PIN CHEN.03042015.
This
checklist was reviewed on March 4, 2015 , at NYSEASIA.TV , between Mr. /Ms.
“PPCPE” Of “NYSASIA” and Mr. /Ms. n/a Of N/A , and will be used as the basis of
the Agreement between both parties.
When
agreed to by both parties, this contract list can be attached as a rider to the
Agreement; and therefore, be a part of the Agreement.
1.
Project Description
1.1
Type of Project 1.2 New and/or Existing Building(s) 1.3 Type of Construction
(i.e., steel and concrete, concrete, etc.) 1.4 Number of Buildings 1.5 Base
Building Core and Shell and/or Tenant Work 1.6 Gross Square Feet Areas of
Building(s) and Site (Acres) 1.7 Location (address if available) City, State,
Country 1.8 Estimated cost if established 1.9 Method of preparing documents and
bidding (i.e., Fast track, multiple prime contract, etc.) Work Additional
Comments
2.
Scope of Services Included Engineering Services
a.
Schematic Design Phase*-P2 OF 7.
No comments:
Post a Comment