ieee.mobi,leee.mobi,NYSEASIA.com,Good days worldwide

June 8th.,2010

Say Hi!

Nice everyday!

Ieee.mobi,PPC,P.E.
SFL,leee.mobi
Mission Critical & Essential.com
Music Essential,Broad,Worldwide
Dot,Optical,Pacific Rims, A+A,Worldwide

Friday, January 25, 2019

ONCE UPON A TIME, SINCE YEAR 1953, AND ONCE UPON "10 MORE TIMES" DURING YEARS 1991 UP TO NOW IN YEAR 2019, JANUARY 25, ETC.


DATE: JANUARY 25, FRIDAY, 2019.

MOST THANKFUL ALWAYSD.

BY THE WAY, I AM SO HAPPY SEE, SAW, SEING THIS PEOPLE’S NEWS IN MY FACEBOOK :

PHILIP PAI-PIN CHEN.

IN THES DAYS.

HIGHLY APPRECIATED.

AND LET ME TELL AND TELLING EVRYONE IN HERE :

IN YEAR 1975, SEPTEMBER, OCTOBER , UP TO 18, IN THE ABOUT 40 DAYS I RECEIVED THE PEOPLE’S PAPER NEWS ABOUT TEN ISSUED AND DELIVERED TO MY FIRST TIME STAYED AND LIVED IN UP-TOWN, MANHATTAN, NYC, NY, USA .

SO, GOOD, NOW AFTER 43 YEARS FROM YEAR YEAR 1975, SEP./ OCT. I “RECEIVED” EARNED THESE NEWS , PEOPLE’S IN MY FACEBOOK, IN INTERNET.

THANKS FOR YOU AND YOU ALL , BEST PERFORMANCES AND GREATEST SOCIAL SERVICES LOCAL, NATIONAL, WORLDWIDE.

OK.

PLEASE NOTE:

THE FOLLOWING WORDS, THE PART OF MY WORDS WRITTEN, CREATED IN THE PAST, SOME EVEN BACK TO YEARS DURING 1979- 1988.

SEE.

WHAT ABOUT:

NYSEASIA.TV

NYSEASIA.US

NYSEASIA.COM

NYSEASIAWORLDWIDE.

PAIPIN CHEN.

PAI-PIN CHEN,P.E., SINCE YEAR 1983, AUGUST 29.

PHILIP PAI-PIN CHEN, P.E., SINCE YEAR 1985, JUNE WITH MY ENGLISH NAME PHILIP , CONNECTING TO MY ORIGINAL NAME PAI-PIN CHEN, P.E. AFTER I WORKED, EMPLOYED IN THE MOST FAMOUS CONSULTING ENGINEERING COMPANY:

JAROS, BAUM & BOLLES,JB&B.

THANKS.

MY TERRITORIES WITH MANY SINCE YEAR 1972-1975, AND IN YEARS 1975-1978, 1979-1988, 1989,1990, 1991, AND FROM THE YEARS FROM YEAR 1992-2003, DECEMBER 31ST., SEPTEMBER/OCTOBER/NOVEMBER 2006- UP TO YEAR 2006, DECEMBER, AND SINCE JANUARY 21ST., UP TO TODAY, JANUARY 13, SUNDAY, 2019, AND UP TO COMING MANY YEARS NOW AND THEN.

MOST THANKFUL ALWAYS.

HAPPY NEW YEAR 2019.

NYSEASIA NY

PAI PIN ,SYOU FEN, V. CHEN.

NYSEASIA@HOTMAIL.COM.

NYSEASIA@GMAIL.COM.

MY TASKS MY PERFORMANCES WILL BE ON AS THE FOLLOWING MY WORDS , MY CONCEPTUAL, MY ABILITITES, MY CAPACITIES SINCE YEAR 1972-1975, AND DURING MY TIME IN YEARS 1979-1988.AND 1989-1990-1991, JAN. -OCTOBER.

THANKS.

THE FOLLOWING ABOUT 9-10 PAGES TOTAL.

DATE: JANUARY 13, SUNDAY, 2019.

TODAY IS MY BEST DAY, SINCE THE DAY, NOVEMBER 1ST., 1991.

I. THE FOLLOWING PROJECT, PROJECTS SINCE DURING MY ASSISTANT ENGINEER IN CHUNGHSIN ELECTRIC AND MECHANICAL MANUFACTURE FIRM, LOCATED IN CHUNGHO VILLAGE, BANCHAIO CITY, TAIPEI HSIEN, NORTH TAIWAN, REPUBLIC OF CHINA DURING YEARS 1972 AUGUST- 1975, JULY.

II. DURING YEARS 1979, JANUARY – MARCH, I DESIGNED THE EMERGENCY GENERATIOR WITH ATS FOR THE HOSPITALS LOCATED IN MANHATTAN, NYC, NY, USA.

III. DURING YEARS 1979, MAY UP TO MAY, 1984, I DESIGNED THE EMERGENCY GENERATORS AND ATS FOR THE HOSPITALS, GOVERNMENT OFFICES, PRIVATE MAIN HIGH RISE BUILDINGS, FOR THE EMERGENCY POWER SUPPLY SYSTEMS OF BUILDINGS, HOUSING FACILITIES, ETC., IN NEW YORK CITY, WASHINGTON, D.C.,ATLANTA, GEORGIA,ORLANDO, FLORIDA,DEVER, OKLAHOMA, LAS VEGAS, ETC.

IV. DURING YEARS 1980-1988, SEPTEMBER, I DESIGNED THE GENERAL, EMERGENCY AND CRITICAL ELECTRICAL POWER SYSTEMS FOR THE HIGH RISE BUILDINGS, BANKING, INSTITUTIONS, COLLEGE, AIR-PORT, “SPECIAL BUILDINGS, FACILITIES”,

ETC.

THANKS.

Date: July 29, 2015

Philip Pai-Pin Chen

Please note:

These information Original,Wrote ,Copy and shown in year 1999-2000, and posted in year 2007, Materials shown below Not for any purposes.

“Words shown to be reviewed and checked again-if you interested”.

Thanks-Philip Pai-Pin Chen

Draft:

“NOT For Construction” .

Revised and updated required.

Attention please:

I. Please contact me via nyseasia@gmail.com and concerns for your coming and existing projects, local, national and worldwide.

MissionCritical.com

FaceEssential.com.

NYEssential.com

BateryAssociates.com

Mechanical & Electrical Engineering ,Professionals and consultants,USA, Asia & Worldwide.

II. Materials shown below Not for any purposes.

III. Thanks- Philip Pai-Pin Chen-dated on February 21, 2015.

April 9th, 2007(First issued in year 2007 or later)

Can we get there from here ?

Do right things, Do things right !Do right time !

Hi! Guys, gals, & Folks, and me too!

IEEE.mobi, NYSEASIA US.

Subject: “M&E Design Data Bank”

RE: Gen.Set

HVAC questionaire to be issued to Electrical Department

Project:

Date:

HVAC Project Engineer:

Electrical Project Engineer:

A. Engine

1. Engine Generator Capacity (full load KW)

2. Type of Engine:

a. Gas.

b. Diesel.

c. Turbine.

d. Other.

3. Engine generator make design will be based on:

4. Engine generator overall sizes:

a. Length:

b. Width:

c. Height:

5. Number of engines generators working simultaneously:

B. Fuel System

1. Is transfer pump part of and mounted on engine?

a. Max. total suction head (ft) (lift and line resistance)

b. Capacity (gpm)

2. a. Is day tank part of engine:

c. size:

d. Controls furnished with day tank:

(1) High Alarm

(2) Pump Off.

(3) Pump on.

(4) Low Alarm.

e. Pipe connection sizes:

(1) Suction.

(2) Return.

(3) Overflow (if Required).

3. Day tank furnished separately:

4. Size per engine (gal)

5. Fuel oil pumping rate per engine.

6. Type of fuel.

7. Other:

C. Radiator

1. Radiator & fan mounted on engine block skid (engine drives radiator fan).

a. Comes all inter-connecting piping between radiator & engine with the unit.

b. If not what external piping has to be furnished?

c. Are vibration isolators for engine block skid to be furnished separately?

2. Radiator and fan remotely located from engine (but in same room).

a. Radiator cooling water pipe connecting sizes.

b. Cooling water flow: gpm

c. Location of radiator.

d. Radiator make design will be based on:

3. Radiator and fan remotely located from engine (outside of engine room).

a. Location.

b. Elevation of radiator in relation to engine (ft.).

c. Radiator cooling water pipe connecting sizes.

d. Cooloing water flow (gpm).

4. What equipment is part of radiator?

a. Surge tank.

b. Ventiline from radiator to surge tank.

c. Vacuum breaker.

d. Thermometer wells.

e. If surge tank is not part of radiator furnished by radiator manufacturer what size is required?

D. COOLING WATER SYSTEM

1. Volume

a. Engine only (gall.)

b. Radiator for max. ambient of 110 deg. F.

c. Radiator for max. ambient of 125Deg. F. (gal).

2. Water pump performance (pump furnished with engine).

a. Is pump mounted on the engine.

b. Jacket water

(1) capacity at ft.. (gal)

(2). Capacity at ft.

(4) Maximum allowable static head (ft).

(5) Cooling water pipe connecting sizes.

(6) Internal pressure drop through equipment.

3. Auxiliary water

a. Lub oil cooler.

(1) Capacity at ft. (gal).

(2) Capacity at 0 ft (gal).

(3) Max. allowable static head (ft).

(4) Cooling water pipe connecting sizes.

(5) Internal pressure drop through equpment (ft).

b., Other ( )

(1) Capacity at ft. (gal).

(2) Capacity at 0 ft . (gal).

(3). Max. allowable static head (ft).

(3) Cooling water pipe connecting sizes.

(4) Internal pressure drop through equipment (ft).

4. Maximum system pressure (psi).

a. Water jacket.

b. After cooler.

c. Radiator.

d. Lub oil cooler.

e. Other ( )

5. Can heat exchange be mounted on the engine and be part of it?

a. Size.

b. Capacity.

c. Connecting pipe sizes.

E. Heat Rejection

1. To jacket water (including standard mainfold, after cooler, oil cooler )

(Btu/min)

2. Maximum jacket water temperature (Deg.F).

3. Radiator data

a. Air flow through radiator with air entering radiator at:

(1) 95Deg.F (CFM)

(2) 105 Deg.F. (CFM)

(3) 110 Deg.F. (CFM)

(4) 120 Deg.F (CFM)

 HVAC design guide calls for 110deg. F. entering temperature when radiator is in the same room as tne engine.

b. Maximum allowable external static pressure at discharge side of radiator (in”).

F. ENGINE ROOM VENTILATION REQUIREMENTS

1. COMBUSTION AIR REQUIREMENTS AT 85Deg.F.

2. Heat radiated by engine (btu/min)

3. Heat dissipated by generator (Btu/min).

4. Ventilation requirements (based on 15Deg F. Delta T) (CFM) (engine and generator radiated heat only).

G. EXHAUST SYSTEM

1. Gas Volume (CFM).

2. Gas temperature (Deg.F).

3. Max. permissible back pressure (in).

4. Exhaust pipe size connection at engine.

5. Exhaust pipe size based on:

a. ft straight horizontal pipe.

b. Ft vertical pipe.

c. Elbows.

6. Muffler Data

a. Size.

b. Weight.

c. Flexible Connection (by whom).

7. Exhaust stack size bases on:

a. number of engines operating simultaneously.

b. Ft straight horizontal pipe.

c. Ft vertical pipe.

d. Elbows.

8. Crank-case breather vent piping.

a. connecting size at engine.

b. Pipe size.

H. DIESEL LUBRICATING SYSTEM REQUIREMENTS

1. Is pump mounted on engine and part of package?

a. Pump Capacity:

(1) gpm.

(2) Head (ft)

2. Flow gpm.

3. External pipe size requirements.

4. Storage or reservoir capacity (gal)

I. STARTING SYSTEM

1. Air system.

a. Min. air pressure required at motor (psi).

b. Max. air pressure allowed at motor (psi).

2. Others.

_________________________________________________________

Subject: M&E Design Data Bank

Re: Em. Gen. Set

__________________________________________________________

1. GENERAL

The intent of this Design Guide is to outline the procedure to follow in designing standby power plants for use as an alternate source of power in the event of failure of the normal electrical service. It does not cover other alternate sources of power which may be required or permitted by Code (i.e., battery system, tapping ahead of main switches of two separate services, etc.). Costs are also not included as they will vary with each project.

2. CRITERIA

a. Tabulate the load which is to be on the emergency system. Include the following:

(1) Minimum emergency loads required or recommended by Code:

(2) Emergency loads required for standby power plant auxiliary equipment, including:

(3) ADDITIONAL EMERGENCY LOADS REQUESTED BY Owner.

(4) Additional emergency loads recommended by Consultants, PPC/ADSC and approved by Owner.

b. List the sum of loads from 'a" above as follows:

_____________________________________________________

EMERGENCY LOADS HP KW P.F. KVA D.F. DEMAND

KVA

______________________________________________________

(a).Sum of incandescent 1.0

lighting loads

(b).Sum of electrical 1.0

heating loads

©. Sum of fluorescent

and mercury loads .9

(d). Individual motor

loads (2)

TOTALS

Conn. HP:

Conn. KW:

Conn. KVA:

Demand KVA:

___________________________________________________________

Notes:

(1) Power factors for motors normally vary from .80 to .95.

(2) List only the largest motors that are to operate on emergency simultaneously.

(3) HP x .746/ Motor Efficency = KW; KW/P.F. =KVA;

KVA x D.F. = Demand KVA

P.F. (System) = KW ( Conn. )/ KVA ( Conn. )

c. Using the demand KVA and system power factors obtained in 'b" above, select the generator as fellows:

(1). Add spare (as required).

(3) Subtract any loads included in 'b' which will be put on emergency manually only when the load conditions allow it (selective loading).

(4) Select next higher size generator (continuous rating) available from at least three of the base bid manufacturers listed.

(a) Ideal.

(b) Electric Machinery

(c) Delco.

(d) G.E.

(e) Century.

(f) Westinghouse.

(5). Using selected generator, calculate voltage dip due to starting of single motor, ( or simultaneous starting of group of motors) with largest locked rotor KVA. Use manufacturer's tables for calculating dip. If dip exceeds 5%, recalculate based on next higher generator size or investigate use of reduced voltage starters on the motors.

(6). Determine generator output voltage by weighing the following factors:

(a) Normal operating voltage(s) of equipment on emergency.

(b) Cost, space and weight of transformers.

(c) Cost of, and spare required for , distributing wiring.

(7). Size generator 3 phase main fused switch or circuit breaker as follows:

(a) Continuous current rating:

I = KVA Gen./(1.732 x E Gen. Line to Line)

(b) Interrupting Rating: Determine from generator manufacturer maximum three phase fault current available and rate accordingly.

(8). Generator grounding : For normal applications , directly

grounded wye connection and frame of generator to cold

water main or driven ground rods. Where generator line to

ground fault current exceeds three phase fault current

either:

(a) Specify generator capable application of withstanding greater fault current and increase interrupting rating of generator main fused switch or circuit breaker accordingly, or

(b) Furnish a low-value reactor or resistor in ground conductor which will limit line to ground fault current to a value between 25% and 100% of three phase fault current.

(9) Check Code regulations on generators:

(a) Taichung, Taiwan: Article ?

(b) Taiwan : NFPA # ?, Article ?

(c) National: NFPA #? , Article ?

d. Select engine as follows:

(1) Determine type of engine and fuel to be specified, using the following as a guide:

(a). Diesel engine: Most commonly used, most familiar to maintenance engineers, large selection of sizes. Howerever, require inertia block. Specifify at highest speed available in order to reduce weight weight and cost. Specify for use with #2 diesel oil (lowest sulphur content fuel commonly available).

(c) Gasoline Engine:

(d) Natural Gas:

(e) Turbine:

(2) Determine basic engine BHP required for selected Generator units.

IEEE.MOBI, PAI-PIN CHEN

@ Dot, Optical Pacific Rim, Asia

Jan.03, 2007(FIRST ISSUED).

July 29, 2015, 2015 (third issued).

Filled. ieeemobippcpeAT Dotcom, nyseasiaworldwide.com.

Email: nyseasia@hotmail.com.NYSEASIA NY,Broad, NY, USA etc.

TODAY, 01132019, SUNDAY.

I AM:

PAI PIN CHEN.

NYSEASIA NY

NYSEASIA@HOTMAIL.COM.

NYSEASIA@GMAIL.COM.

MORE COMING NOW AND THEN.

THANK YOU VERY MUCH TO MICROSOFT FIRM, THE BEST FIRM LOCAL, NATIONAL,WORLDWIDE.

MICROSOFT COMPANY IS THE BEST COMPANY , IN USA AND WORLDWIDE.

PERFECT.

BEST ALWAYS.

PERIOD.

FILED.

Saturday, January 19, 2019

MY DAY, JANUARY 19, 2019, 01192019, 011919, THANKS TO MY PARENT AND FAMILY MEMBERS. PAI PIN CHEN.


DATE: JANUARY 19, SATURDAY, 2019.

I GOT MY VERY GOOD CONFIDENCE ON TODAY IN YEAR 2019, NOW AND THEN.

THANKS.

MY PRESENTATION DID IN YEAR 2003, AUGUST 14, AS SHOWN BELOW.

THANKS.

Auguest 14, 2003

_____________________________________________________

RESUME

       

Name : Philip Pai Pin Chen,P.E.     .                      



Mailing Address: P.O. Box 166, Tung Hai University, Taichung, Taiwan

Telphone/Fax # : (04)23-505-789 

Mobile Phone#:  0930- 922-666 ; 0939-90-9595

e-mail: nyctai@ms16.hinet.net



Consulting Engineers, International Services

Professional Experience

1986 To Date -PCA : Power Chen & Associates, Inc.

1993 To Date-MCTI: Mission Critical Technologies, Inc.

1992-1993yr. - C.Y.Lee & Partners, Architects (Taipei, Taiwan).

1989-1991yr. -China Technical Consultants, Inc (Taipei, Taiwan)

1984-1989yr. -Syska & Hennessy, Consulting Engineers. (NYC, USA),

1978-1984yr. -Jaros, Baum &Bolles, Consulting Engineers. (NYC, USA)

1978yr. -Caretsky & Associates, Consulting Engineers. (New York, USA)

1972-1975yr. -Chung Hsin Electric & Machinery Co.Ltd.(Taiwan)

___________________________________________________________________

Special  Landmarks projects:

(1)Goldman Sachs & Co., 85 broad street, New York City, USA  

(2) High-Tech Building Complex,Maryland,USA;Large area building complex with

     office building and high-tech. Lab. Power Co. Sub-station,

     50 MVA/110KV/13.8KV. Double-Ended Unit Sub-stations, 2,500 KVAX12units.

     Gas Turbine Type Emergency  generator Power system, 25MW.

(3) IBM Customer Executive Education Center,Palisades, New York, USA

     Building complex/Office + Show Room+Computer data Center,Classrooms,

     Studios,Hotel, 9,000KVA Electrical System with Three Unit Sub-Stations.

(4) Bank Of China,Hong Kong, China; 87 floos building designed by Architect ,

     Mr. I.M Pei And Parters,Architect firm;  Electrical DistributionSystem:

     11KVrimary/346/200V. 2,000KVA,1,500KVA,1,000KVA,and 750KVA Unit

     Substations located on certain mechnical floors.



The other landmark list :

1. TTII,Taichung 47th floors Tower-Field Observation report on Construction Stage

2. Building Complex and Area Development Project

3. Far-Eastern Plaza, Taipei,Partial Project field Coordination.

4. Cogeneration power plants Promotion Task Force:  approx. 120 cogenerator units

    could be installed in Taiwan and may produce 350MW electricity.

5. E.R. Squibb & Sons, Inc.Lawrenceville, New Jercy, USA, Large high-tech

    Building complex and labortory, 10MVACentral utility power plant and

    associated distribution.

6.Goldman Sachs & Company, Broad Street, New York;10MVA electrical system

   and  super-computer data center

7. IBM ,Customer Executive Education Center, Palisades, New York: 

     Building complex/Office + Show Room+Computer data Center

     Class Rooms+Studios+Hotel

     9,000KVA Electrical System /Three Unit Sub-Stations

8. Morgan Bank, New York City, U.S.A

    60 Floors intelligent office building for banking and trading.

9. Burroughs-Wellcome, Greenville, North Carolina, USA):

    15MW Cogeneration power plant parallel with Electrical Power company.

10. Power Station-Rikers Island, New York City, USA:

       27KV/4160V newly built utility power substation

11. ITT Building ,52nd.Street,New York city, U.S.A

       47  floors high rise Building, Mech. and Electrical load analysis For

       Renovation purpose.

12. Super computer data center, GS&Co., NYC:

      7th. & 8th. Floors computer data center with 1,450KW UPS System and

      associated mechanical system.

13. Super Computer Center,GS&Co. Brooklyn, 4,000KW UPS and Mech.System.

14. "7 Hanover",Low Manhattan,USA: 37th.floors building with trading floors

15. Satelite Operation Station,Mass.,USA;  Mech. & Elec. System for

      Station Operation.

16. Swiss Bank,New York City,USA; Dedicated computer data center for banking

      and trading.

17. "Bankers Trust", Large Computer Data Center,NYC,USA

      UPS System Function Analysis

18."Chemical Bank",Water Street,NYC,USA; 3,000KW UPS System

      Function Analysis

19. Bank Of China,Hong Kong, China; 87 floos building designed by Mr. I.M Pei

      and Parters, Architect.Electrical Distribution system:11KV-Primary/346/200V.

      2,000KVA,1,500KVA,1,000KVA, and 750KVA unit Substations

      located on certain mechnical floors.

20. 599 Lexington Avenue,New York City;The 72 Floors high rise building.

      each floor provided  with Own metering devices.

21."Irving Trust Bank",New York City,USA; Large Computer Dater Center

      with 3,000KW UPS.Electrical -5KV Primary/480/277V Secondary.

      High-Tech. Intelligent Building.

22.American Broadcasting Company, Studio 23/24,NYC;Heavy Lighting System

     with dedicated control system.

23.High-Tech Building Complex,Maryland,USA;

      Large area building complex with office building and high-tech. Lab., Power Co.

      Sub-station-50 MVA/110KV/13.8KV., Double-Ended Unit Sub-stations,

      12 sets of 2,500 KVA transformers,Gas Turbine Type Emergency Power system

      25MW,(2500KWx10).

24. "Pitney Bowes",Headquater,Connecticut, Building designed by

      I.M.Pei And Parters, Electrical Load-4,000KW.

25. "Philip Morris Inc.",42nd.Street,New York City,USA;

      36 floors building,Electrical Load-5,000 KW.

27. General Services Administration,Washington,DC

       Public Services Building-Electrical Load Over 10MW.

28. Technical Facility,Headquarter Complex,

      The Coca Cola Conpany ,Atlanta,Geogia,USA  Electrical Load-9,000 KW

29. Office Building,Coca Cola Company,Atlanta,

      Geogia,USA; Electrical Load-8,000KW

30. Morgan Guarranty Trust Co.,TennantsFloors, NYC, USA:

      Tennant Floor Renovation for offices in downtown area.

31. Sears Tower , 36th. Floor, Chicago, USA

      Mech. & Elec. System Renovation)

32. New York Hospital,Generator Plant Modification

33. Hospital Mechanical Room Renovation

34.Projects in Taiwan  (1972-1975)

     (1) Sun Moon Lake, "Evergreen Lake Palace"(1973)

     (2) Control Center, Taipei "S-lin" district.(1972-1975)

     (3) Emergency Generator set with ATS for 400MHZ, Motor-Generator Set(1974)

     (4) Taipower Building (1974)

     (5) Building complex & factory (1972-1975)

JANUARY 19, 2019.

PAI-PIN CHEN, P.E.


(MNMMBDMHADPPC.).

MCAFEE APPLIED ON TODAY AND COMING DAYS. THANKS. FILED.

Friday, January 18, 2019

MY CURRENT DIGITAL UNITS WORKING VERY GOOD, THESE UNITS BRANDS 1. ASUS, 2. SAMSUNG, ACER. SUPER EXCELLENT. THANKS AGAIN.


DATE: JANUARY 18, FRIDAY, 2019.

TODAY AND IN THE LAST THREE DAYS, I AM SO HAPPY AND “ UN-BELIEVABLE” SO GOOD MY CURRENT DIGITAL UNITS, ASUS, DESK TOP COMPUTER, LAPTOP COMPUTER, SAMSUNG A8 STAR MOBILE DEVICE AND MY ASUS PHONE MOBILE DEVICE, ALL THESE DIGITAL UNITS ARE WORKING VERY GOOD FOR ME, PAI PIN CHEN, IN MY ASSOCIATED INTERNET, ESPECIALLY POSTING MY WORDS, PHOTOS, VUDEOS IN MY FACEBOOK: 1. NYSEASIA NY,2. PAIPIN CHEN, 3. PHILIP PAI-PIN CHEN, P.E. AND NYSEASIA, GOOGLE-BLOGGER.

TODAY AT THIS MOMENT, I AM RE-ARRANGEING MY STORAGE OF ALL OF DIGITAL DATA, WORDS, PHOTOS, VIDEOS, ETC., AND I AM APPRECIATED, ALL ARE STORAGED INFORMATIONS, DATA, WORDS, PHOTOS, VIDEOS, ETC. ARE ALIVE AND CAN BE RECORED AND TRANSFERING IN MY DISK, 64GB, 32GB, 16GB, 1000GB, 2000GB, SINCE ABOUT 5, 10, 15, YEARS AGO.

NOW I AM TELLING WHAT I CAN DO BASED ON WHAT I JUST SAID NOW IN HERE IN MY FACEBOOK, AND IN MY GOOGLE- BLOGGER, NYSEASIA.

SEE.

THANKS.

NYSEASIA,NYPEASIA, NYCEASIA.

PAI PIN CHEN, INTERNET.

V. CHEN. PAI PIN & SYOU FEN CHEN.



NYSEASIA.TV, NYSEASIA.US, NYSEASIA.COM, NYSEASIAWORLDWIDE.COM.

MISSION ESSENTIAL AND CRITICAL WORLDWIDE VSINCE YEAR 1971.

MISSION CRITICAL AND ESSENTIAL WORLDWIDE SINCE YEAR 1979.

THANKS AGAIN.

01182019, FRIDAY.

FILED.

putin.life, MOST POWERFUL, MOST THANKFUL ALWAYS, THANK YOU VERY MUCH. PAI-PIN CHEN, P.E., JANUARY, 18, FRIDAY, 2019.


DATE: JANUARY 18, THURSDAY, 2019.

NYSEASIA, NYPEASIA, NYCEASIA.

PAI PIN CHEN, INTERNET.

KEY /PRIMARY.

MOST FAMOUS.

MOST POPULAR.

MOST POWERFUL.

MOST WONDERFUL.

MOST SPECIAL .

MOST THANKFUL ALWAYS.

WITH YOU SINCE MORE THAN " 35" YEARS AGO, WHEN I WORKED THE PROFESSIONAL GRADUATED FROM COLUMBIA UNIVERSITY AND HE WORKED IN MARYLAND, WASHINGTON, D.C. AND COORDINATED WITH ME FOR ONE VERY SPECIAL PROJECT FOR USA OFFICIAL SPECIAL TEM, GROUP.

AND YOU ARE THE BEST PERSON, IN RUSSIA, LOCAL, NATIONAL AND WORLDWIDE.

PS: TODAY, LET ME TELL YOU AND YOU ALL, IN YEAR 1983, I WENT TO TOKYO JAPAN, EMPEROR FACILITIES, ONE OF THE BUILDING TO BUILD, CONSTRUCTED EMERGENCY GENERATOR SYSTEM WITH ATS, AUTOMATIC TRANSFER SWITH, AND POWER PANEL BORD. AGAIN, MY THIS PROJECT LOCATED IN THE JAPAN KING'S FACILITY, TOKYO, JAPAN, ASIA.

YOU ARE THE BEST WITH RUSSIA, CHINA, USA,EUROPE, MIDDLE EAST,AFRICA, ETC.

THANK YOU VERY MUCH.

AGAIN, YOU ARE THE BEST IN LOCAL, NATIONAL AND WORLDWIDE.

HIGHLY APPRECIATED.

PAIPIN CHEN.

NYSEASIA,NYPEASIA,NYCEASIA.

PAI PIN & SYOU FEN CHEN.

THANK YOU VERY MUCH FOR SEEING YOU OFTEN IN HERE IN MY FACEBOOK, IN THE PAST, NOW AND COMING YEARS.

I AM: PAI-PIN CHEN, P.E.

I DESIGNED ONE PROJECT WITH EMERGENCY GENERATOR, WITH ATS IN THE USA "OFFICE" LOCATED IN MOSCOW CITY, RUSSIA IN YEAR 1981/1982.

THANKS.

NYSEASIA@HOTMAIL.COM.

NYSEASIA@GMAIL.COM.

JANUARY 18, FRIDAY, 2019.

FILED.

Thursday, January 17, 2019

MY, PAI PIN CHEN, TERRITORIES IN THE PAST, NOW AND COMING YEARS., THANKS. AS A GOOD CONSULTANTS IN PUBLIC. JANUARY 17, THU., 2019.


NYSEASIA.TV

NYSEASIA.US

NYSEASIA.COM

NYSEASIAWORLDWIDE.

PAIPIN CHEN.

PAI-PIN CHEN,P.E., SINCE YEAR 1983, AUGUST 29.

PHILIP PAI-PIN CHEN, P.E., SINCE YEAR 1985, JUNE WITH MY ENGLISH NAME PHILIP , CONNECTING TO MY ORIGINAL NAME PAI-PIN CHEN, P.E. AFTER I WORKED, EMPLOYED IN THE MOST FAMOUS CONSULTING ENGINEERING COMPANY:

JAROS, BAUM & BOLLES,JB&B.

THANKS.

MY TERRITORIES WITH MANY SINCE YEAR 1972-1975, AND IN YEARS 1975-1978, 1979-1988, 1989,1990, 1991, AND FROM THE YEARS FROM YEAR 1992-2003, DECEMBER 31ST., SEPTEMBER/OCTOBER/NOVEMBER 2006- UP TO YEAR 2006, DECEMBER, AND SINCE JANUARY 21ST., UP TO TODAY, JANUARY 13, SUNDAY, 2019, AND UP TO COMING MANY YEARS NOW AND THEN.

MOST THANKFUL ALWAYS.

HAPPY NEW YEAR 2019.

NYSEASIA NY

PAI PIN ,SYOU FEN, V. CHEN.

NYSEASIA@HOTMAIL.COM.

NYSEASIA@GMAIL.COM.

MY TASKS MY PERFORMANCES WILL BE ON AS THE FOLLOWING MY WORDS , MY CONCEPTUAL, MY ABILITITES, MY CAPACITIES SINCE YEAR 1972-1975, AND DURING MY TIME IN YEARS 1979-1988.AND 1989-1990-1991, JAN. -OCTOBER.

THANKS.

THE FOLLOWING ABOUT 9-10 PAGES TOTAL.

DATE: JANUARY 13, SUNDAY, 2019.

TODAY IS MY BEST DAY, SINCE THE DAY, NOVEMBER 1ST., 1991.

I. THE FOLLOWING PROJECT, PROJECTS SINCE DURING MY ASSISTANT ENGINEER IN CHUNGHSIN ELECTRIC AND MECHANICAL MANUFACTURE FIRM, LOCATED IN CHUNGHO VILLAGE, BANCHAIO CITY, TAIPEI HSIEN, NORTH TAIWAN, REPUBLIC OF CHINA DURING YEARS 1972 AUGUST- 1975, JULY.

II. DURING YEARS 1979, JANUARY – MARCH, I DESIGNED THE EMERGENCY GENERATIOR WITH ATS FOR THE HOSPITALS LOCATED IN MANHATTAN, NYC, NY, USA.

III. DURING YEARS 1979, MAY UP TO MAY, 1984, I DESIGNED THE EMERGENCY GENERATORS AND ATS FOR THE HOSPITALS, GOVERNMENT OFFICES, PRIVATE MAIN HIGH RISE BUILDINGS, FOR THE EMERGENCY POWER SUPPLY SYSTEMS OF BUILDINGS, HOUSING FACILITIES, ETC., IN NEW YORK CITY, WASHINGTON, D.C.,ATLANTA, GEORGIA,ORLANDO, FLORIDA,DEVER, OKLAHOMA, LAS VEGAS, ETC.

IV. DURING YEARS 1980-1988, SEPTEMBER, I DESIGNED THE GENERAL, EMERGENCY AND CRITICAL ELECTRICAL POWER SYSTEMS FOR THE HIGH RISE BUILDINGS, BANKING, INSTITUTIONS, COLLEGE, AIR-PORT, “SPECIAL BUILDINGS, FACILITIES”,

ETC.

THANKS.

Date: July 29, 2015

Philip Pai-Pin Chen

Please note:

These information Original,Wrote ,Copy and shown in year 1999-2000, and posted in year 2007, Materials shown below Not for any purposes.

“Words shown to be reviewed and checked again-if you interested”.

Thanks-Philip Pai-Pin Chen

Draft:

“NOT For Construction” .

Revised and updated required.

Attention please:

I. Please contact me via nyseasia@gmail.com and concerns for your coming and existing projects, local, national and worldwide.

MissionCritical.com

FaceEssential.com.

NYEssential.com

BateryAssociates.com

Mechanical & Electrical Engineering ,Professionals and consultants,USA, Asia & Worldwide.

II. Materials shown below Not for any purposes.

III. Thanks- Philip Pai-Pin Chen-dated on February 21, 2015.

April 9th, 2007(First issued in year 2007 or later)

Can we get there from here ?

Do right things, Do things right !Do right time !

Hi! Guys, gals, & Folks, and me too!

IEEE.mobi, NYSEASIA US.

Subject: “M&E Design Data Bank”

RE: Gen.Set

HVAC questionaire to be issued to Electrical Department

Project:

Date:

HVAC Project Engineer:

Electrical Project Engineer:

A. Engine

1. Engine Generator Capacity (full load KW)

2. Type of Engine:

a. Gas.

b. Diesel.

c. Turbine.

d. Other.

3. Engine generator make design will be based on:

4. Engine generator overall sizes:

a. Length:

b. Width:

c. Height:

5. Number of engines generators working simultaneously:

B. Fuel System

1. Is transfer pump part of and mounted on engine?

a. Max. total suction head (ft) (lift and line resistance)

b. Capacity (gpm)

2. a. Is day tank part of engine:

c. size:

d. Controls furnished with day tank:

(1) High Alarm

(2) Pump Off.

(3) Pump on.

(4) Low Alarm.

e. Pipe connection sizes:

(1) Suction.

(2) Return.

(3) Overflow (if Required).

3. Day tank furnished separately:

4. Size per engine (gal)

5. Fuel oil pumping rate per engine.

6. Type of fuel.

7. Other:

C. Radiator

1. Radiator & fan mounted on engine block skid (engine drives radiator fan).

a. Comes all inter-connecting piping between radiator & engine with the unit.

b. If not what external piping has to be furnished?

c. Are vibration isolators for engine block skid to be furnished separately?

2. Radiator and fan remotely located from engine (but in same room).

a. Radiator cooling water pipe connecting sizes.

b. Cooling water flow: gpm

c. Location of radiator.

d. Radiator make design will be based on:

3. Radiator and fan remotely located from engine (outside of engine room).

a. Location.

b. Elevation of radiator in relation to engine (ft.).

c. Radiator cooling water pipe connecting sizes.

d. Cooloing water flow (gpm).

4. What equipment is part of radiator?

a. Surge tank.

b. Ventiline from radiator to surge tank.

c. Vacuum breaker.

d. Thermometer wells.

e. If surge tank is not part of radiator furnished by radiator manufacturer what size is required?

D. COOLING WATER SYSTEM

1. Volume

a. Engine only (gall.)

b. Radiator for max. ambient of 110 deg. F.

c. Radiator for max. ambient of 125Deg. F. (gal).

2. Water pump performance (pump furnished with engine).

a. Is pump mounted on the engine.

b. Jacket water

(1) capacity at ft.. (gal)

(2). Capacity at ft.

(4) Maximum allowable static head (ft).

(5) Cooling water pipe connecting sizes.

(6) Internal pressure drop through equipment.

3. Auxiliary water

a. Lub oil cooler.

(1) Capacity at ft. (gal).

(2) Capacity at 0 ft (gal).

(3) Max. allowable static head (ft).

(4) Cooling water pipe connecting sizes.

(5) Internal pressure drop through equpment (ft).

b., Other ( )

(1) Capacity at ft. (gal).

(2) Capacity at 0 ft . (gal).

(3). Max. allowable static head (ft).

(3) Cooling water pipe connecting sizes.

(4) Internal pressure drop through equipment (ft).

4. Maximum system pressure (psi).

a. Water jacket.

b. After cooler.

c. Radiator.

d. Lub oil cooler.

e. Other ( )

5. Can heat exchange be mounted on the engine and be part of it?

a. Size.

b. Capacity.

c. Connecting pipe sizes.

E. Heat Rejection

1. To jacket water (including standard mainfold, after cooler, oil cooler )

(Btu/min)

2. Maximum jacket water temperature (Deg.F).

3. Radiator data

a. Air flow through radiator with air entering radiator at:

(1) 95Deg.F (CFM)

(2) 105 Deg.F. (CFM)

(3) 110 Deg.F. (CFM)

(4) 120 Deg.F (CFM)

HVAC design guide calls for 110deg. F. entering temperature when radiator is in the same room as tne engine.

b. Maximum allowable external static pressure at discharge side of radiator (in”).

F. ENGINE ROOM VENTILATION REQUIREMENTS

1. COMBUSTION AIR REQUIREMENTS AT 85Deg.F.

2. Heat radiated by engine (btu/min)

3. Heat dissipated by generator (Btu/min).

4. Ventilation requirements (based on 15Deg F. Delta T) (CFM) (engine and generator radiated heat only).

G. EXHAUST SYSTEM

1. Gas Volume (CFM).

2. Gas temperature (Deg.F).

3. Max. permissible back pressure (in).

4. Exhaust pipe size connection at engine.

5. Exhaust pipe size based on:

a. ft straight horizontal pipe.

b. Ft vertical pipe.

c. Elbows.

6. Muffler Data

a. Size.

b. Weight.

c. Flexible Connection (by whom).

7. Exhaust stack size bases on:

a. number of engines operating simultaneously.

b. Ft straight horizontal pipe.

c. Ft vertical pipe.

d. Elbows.

8. Crank-case breather vent piping.

a. connecting size at engine.

b. Pipe size.

H. DIESEL LUBRICATING SYSTEM REQUIREMENTS

1. Is pump mounted on engine and part of package?

a. Pump Capacity:

(1) gpm.

(2) Head (ft)

2. Flow gpm.

3. External pipe size requirements.

4. Storage or reservoir capacity (gal)

I. STARTING SYSTEM

1. Air system.

a. Min. air pressure required at motor (psi).

b. Max. air pressure allowed at motor (psi).

2. Others.

_________________________________________________________

Subject: M&E Design Data Bank

Re: Em. Gen. Set

__________________________________________________________

1. GENERAL

The intent of this Design Guide is to outline the procedure to follow in designing standby power plants for use as an alternate source of power in the event of failure of the normal electrical service. It does not cover other alternate sources of power which may be required or permitted by Code (i.e., battery system, tapping ahead of main switches of two separate services, etc.). Costs are also not included as they will vary with each project.

2. CRITERIA

a. Tabulate the load which is to be on the emergency system. Include the following:

(1) Minimum emergency loads required or recommended by Code:

(2) Emergency loads required for standby power plant auxiliary equipment, including:

(3) ADDITIONAL EMERGENCY LOADS REQUESTED BY Owner.

(4) Additional emergency loads recommended by Consultants, PPC/ADSC and approved by Owner.

b. List the sum of loads from 'a" above as follows:

_____________________________________________________

EMERGENCY LOADS HP KW P.F. KVA D.F. DEMAND

KVA

______________________________________________________

(a).Sum of incandescent 1.0

lighting loads

(b).Sum of electrical 1.0

heating loads

©. Sum of fluorescent

and mercury loads .9

(d). Individual motor

loads (2)

TOTALS

Conn. HP:

Conn. KW:

Conn. KVA:

Demand KVA:

___________________________________________________________

Notes:

(1) Power factors for motors normally vary from .80 to .95.

(2) List only the largest motors that are to operate on emergency simultaneously.

(3) HP x .746/ Motor Efficency = KW; KW/P.F. =KVA;

KVA x D.F. = Demand KVA

P.F. (System) = KW ( Conn. )/ KVA ( Conn. )

c. Using the demand KVA and system power factors obtained in 'b" above, select the generator as fellows:

(1). Add spare (as required).

(3) Subtract any loads included in 'b' which will be put on emergency manually only when the load conditions allow it (selective loading).

(4) Select next higher size generator (continuous rating) available from at least three of the base bid manufacturers listed.

(a) Ideal.

(b) Electric Machinery

(c) Delco.

(d) G.E.

(e) Century.

(f) Westinghouse.

(5). Using selected generator, calculate voltage dip due to starting of single motor, ( or simultaneous starting of group of motors) with largest locked rotor KVA. Use manufacturer's tables for calculating dip. If dip exceeds 5%, recalculate based on next higher generator size or investigate use of reduced voltage starters on the motors.

(6). Determine generator output voltage by weighing the following factors:

(a) Normal operating voltage(s) of equipment on emergency.

(b) Cost, space and weight of transformers.

(c) Cost of, and spare required for , distributing wiring.

(7). Size generator 3 phase main fused switch or circuit breaker as follows:

(a) Continuous current rating:

I = KVA Gen./(1.732 x E Gen. Line to Line)

(b) Interrupting Rating: Determine from generator manufacturer maximum three phase fault current available and rate accordingly.

(8). Generator grounding : For normal applications , directly

grounded wye connection and frame of generator to cold

water main or driven ground rods. Where generator line to

ground fault current exceeds three phase fault current

either:

(a) Specify generator capable application of withstanding greater fault current and increase interrupting rating of generator main fused switch or circuit breaker accordingly, or

(b) Furnish a low-value reactor or resistor in ground conductor which will limit line to ground fault current to a value between 25% and 100% of three phase fault current.

(9) Check Code regulations on generators:

(a) Taichung, Taiwan: Article ?

(b) Taiwan : NFPA # ?, Article ?

(c) National: NFPA #? , Article ?

d. Select engine as follows:

(1) Determine type of engine and fuel to be specified, using the following as a guide:

(a). Diesel engine: Most commonly used, most familiar to maintenance engineers, large selection of sizes. Howerever, require inertia block. Specifify at highest speed available in order to reduce weight weight and cost. Specify for use with #2 diesel oil (lowest sulphur content fuel commonly available).

(c) Gasoline Engine:

(d) Natural Gas:

(e) Turbine:

(2) Determine basic engine BHP required for selected Generator units.

IEEE.MOBI, PAI-PIN CHEN

@ Dot, Optical Pacific Rim, Asia

Jan.03, 2007(FIRST ISSUED).

July 29, 2015, 2015 (third issued).

Filled. ieeemobippcpeAT Dotcom, nyseasiaworldwide.com.

Email: nyseasia@hotmail.com.NYSEASIA NY,Broad, NY, USA etc.

TODAY, 01132019, SUNDAY.

I AM:

PAI PIN CHEN.

NYSEASIA NY

NYSEASIA@HOTMAIL.COM.

NYSEASIA@GMAIL.COM.

MORE COMING NOW AND THEN.

THANK YOU VERY MUCH TO MICROSOFT FIRM, THE BEST FIRM LOCAL, NATIONAL,WORLDWIDE.

MICROSOFT COMPANY IS THE BEST COMPANY , IN USA AND WORLDWIDE.

PERFECT.

BEST ALWAYS.

PERIOD.

FILED.