DATE:
JANUARY 19, SATURDAY, 2019.
I GOT MY
VERY GOOD CONFIDENCE ON TODAY IN YEAR 2019, NOW AND THEN.
THANKS.
MY
PRESENTATION DID IN YEAR 2003, AUGUST 14, AS SHOWN BELOW.
THANKS.
Auguest
14, 2003
_____________________________________________________
RESUME
Name :
Philip Pai Pin Chen,P.E. .
Mailing
Address: P.O. Box 166, Tung Hai University, Taichung, Taiwan
Telphone/Fax
# : (04)23-505-789
Mobile
Phone#: 0930- 922-666 ; 0939-90-9595
e-mail:
nyctai@ms16.hinet.net
Consulting
Engineers, International Services
Professional
Experience
1986 To
Date -PCA : Power Chen & Associates, Inc.
1993 To
Date-MCTI: Mission Critical Technologies, Inc.
1992-1993yr.
- C.Y.Lee & Partners, Architects (Taipei, Taiwan).
1989-1991yr.
-China Technical Consultants, Inc (Taipei, Taiwan)
1984-1989yr.
-Syska & Hennessy, Consulting Engineers. (NYC, USA),
1978-1984yr.
-Jaros, Baum &Bolles, Consulting Engineers. (NYC, USA)
1978yr.
-Caretsky & Associates, Consulting Engineers. (New York, USA)
1972-1975yr.
-Chung Hsin Electric & Machinery Co.Ltd.(Taiwan)
___________________________________________________________________
Special Landmarks projects:
(1)Goldman
Sachs & Co., 85 broad street, New York City, USA
(2)
High-Tech Building Complex,Maryland,USA;Large area building complex with
office building and high-tech. Lab. Power
Co. Sub-station,
50 MVA/110KV/13.8KV. Double-Ended Unit
Sub-stations, 2,500 KVAX12units.
Gas Turbine Type Emergency generator Power system, 25MW.
(3) IBM
Customer Executive Education Center,Palisades, New York, USA
Building complex/Office + Show
Room+Computer data Center,Classrooms,
Studios,Hotel, 9,000KVA Electrical System
with Three Unit Sub-Stations.
(4) Bank
Of China,Hong Kong, China; 87 floos building designed by Architect ,
Mr. I.M Pei And Parters,Architect
firm; Electrical DistributionSystem:
11KVrimary/346/200V.
2,000KVA,1,500KVA,1,000KVA,and 750KVA Unit
Substations located on certain mechnical
floors.
The other
landmark list :
1.
TTII,Taichung 47th floors Tower-Field Observation report on Construction Stage
2.
Building Complex and Area Development Project
3.
Far-Eastern Plaza, Taipei,Partial Project field Coordination.
4.
Cogeneration power plants Promotion Task Force:
approx. 120 cogenerator units
could be installed in Taiwan and may
produce 350MW electricity.
5. E.R.
Squibb & Sons, Inc.Lawrenceville, New Jercy, USA, Large high-tech
Building complex and labortory,
10MVACentral utility power plant and
associated distribution.
6.Goldman
Sachs & Company, Broad Street, New York;10MVA electrical system
and
super-computer data center
7. IBM
,Customer Executive Education Center, Palisades, New York:
Building complex/Office + Show
Room+Computer data Center
Class Rooms+Studios+Hotel
9,000KVA Electrical System /Three Unit
Sub-Stations
8. Morgan
Bank, New York City, U.S.A
60 Floors intelligent office building for
banking and trading.
9.
Burroughs-Wellcome, Greenville, North Carolina, USA):
15MW Cogeneration power plant parallel with
Electrical Power company.
10. Power
Station-Rikers Island, New York City, USA:
27KV/4160V newly built utility power
substation
11. ITT
Building ,52nd.Street,New York city, U.S.A
47
floors high rise Building, Mech. and Electrical load analysis For
Renovation purpose.
12. Super
computer data center, GS&Co., NYC:
7th. & 8th. Floors computer data
center with 1,450KW UPS System and
associated mechanical system.
13. Super
Computer Center,GS&Co. Brooklyn, 4,000KW UPS and Mech.System.
14.
"7 Hanover",Low Manhattan,USA: 37th.floors building with trading
floors
15.
Satelite Operation Station,Mass.,USA;
Mech. & Elec. System for
Station Operation.
16. Swiss
Bank,New York City,USA; Dedicated computer data center for banking
and trading.
17.
"Bankers Trust", Large Computer Data Center,NYC,USA
UPS System Function Analysis
18."Chemical
Bank",Water Street,NYC,USA; 3,000KW UPS System
Function Analysis
19. Bank
Of China,Hong Kong, China; 87 floos building designed by Mr. I.M Pei
and Parters, Architect.Electrical
Distribution system:11KV-Primary/346/200V.
2,000KVA,1,500KVA,1,000KVA, and 750KVA
unit Substations
located on certain mechnical floors.
20. 599
Lexington Avenue,New York City;The 72 Floors high rise building.
each floor provided with Own metering devices.
21."Irving
Trust Bank",New York City,USA; Large Computer Dater Center
with 3,000KW UPS.Electrical -5KV
Primary/480/277V Secondary.
High-Tech. Intelligent Building.
22.American
Broadcasting Company, Studio 23/24,NYC;Heavy Lighting System
with dedicated control system.
23.High-Tech
Building Complex,Maryland,USA;
Large area building complex with office
building and high-tech. Lab., Power Co.
Sub-station-50 MVA/110KV/13.8KV.,
Double-Ended Unit Sub-stations,
12 sets of 2,500 KVA transformers,Gas
Turbine Type Emergency Power system
25MW,(2500KWx10).
24.
"Pitney Bowes",Headquater,Connecticut, Building designed by
I.M.Pei And Parters, Electrical
Load-4,000KW.
25.
"Philip Morris Inc.",42nd.Street,New York City,USA;
36 floors building,Electrical Load-5,000
KW.
27.
General Services Administration,Washington,DC
Public Services Building-Electrical Load
Over 10MW.
28.
Technical Facility,Headquarter Complex,
The Coca Cola Conpany
,Atlanta,Geogia,USA Electrical
Load-9,000 KW
29. Office
Building,Coca Cola Company,Atlanta,
Geogia,USA; Electrical Load-8,000KW
30. Morgan
Guarranty Trust Co.,TennantsFloors, NYC, USA:
Tennant Floor Renovation for offices in
downtown area.
31. Sears
Tower , 36th. Floor, Chicago, USA
Mech. & Elec. System Renovation)
32. New
York Hospital,Generator Plant Modification
33.
Hospital Mechanical Room Renovation
34.Projects
in Taiwan (1972-1975)
(1) Sun Moon Lake, "Evergreen Lake
Palace"(1973)
(2) Control Center, Taipei
"S-lin" district.(1972-1975)
(3) Emergency Generator set with ATS for
400MHZ, Motor-Generator Set(1974)
(4) Taipower Building (1974)
(5) Building complex & factory
(1972-1975)
JANUARY
19, 2019.
PAI-PIN
CHEN, P.E.
(MNMMBDMHADPPC.).
MCAFEE
APPLIED ON TODAY AND COMING DAYS. THANKS. FILED.
No comments:
Post a Comment