I AM PAI PIN CHEN, I GOT 7 PAGES OF MY PROJECTS CHECKING PROCESS, HERE IS MY PAGE 3, AND POSTING FOR YOU.


P3 OF 7. ( PHILIP PAI-PIN CHEN, P.E., NYSEASIA@GMAIL.COM.).

(1) Studies-Engineer will study The following alternative Systems including advantages, Disadvantages, budget cost And recommendations. -HVAC (INCLUDING CENTRAL PLANTS) (LIST) -ELECTRICAL (List) -SANTARY

P3 OF 6,(List) -VERTICAL TRANSPORTATION (List) -FIRE AND LIFE SAFETY (List) -SECURITY (List) -COMMUNICATIONS (i.e., data, etc.) (List) -Other Notes: (a) Recommendations for further studies In subsequent studies in subsequent Phases of project. (2) Survey of existing facilities and conditions and report of findings. (3) Verification of accuracy of drawings or other information furnished by owner. (4) Design Criteria including applicable codes and standards, and systems descriptions. (5) Space conditions and weights for M/E and other applicable trades equipment. (6) Outline Specifications. (7) System Flow and/or Riser Diagrams, block layouts of M/E and major spaces. (8) Part or full typical floor layout for: -HVAC -ELECTRICAL -SANITARY -FIRE PROTECTION (9) Major equipment sizing. (10) Discussions and confirmation With applicable public agencies And utility companies concerning Project and services. Note: This should be specifically Discussed with client since on some Projects (especially in the Schematic Design Phase) we are directed not To contact anyone regarding the Project. (11) Preparations of estimated Construction costs on a square foot Basis. (Note: This may be provided by Engineer, Construction Manager, General Contractor Or Cost Consultant. )

b. Design Development Phase

(Based on Approved Schematic Design Phase) * (1) Additional Studies for: -HVAC (List) -Electrical (List) -Sanitary (List) -Vertical Transportation (List) -Automation (List) -Fire and Life Safety (List) -Security (List) -Communications (List) -Other (List) (2) Outline Specifications (if not furnished During Schematic Phase) or first pass Using final specifications. If final Specifications are to be used, verify format. (3) Updated drawings confirming space Conditions, weights, equipment and system Sizing and selection. (4) Updated Design Criteria. (5) Updated utility information. (6) Updated estimated construction costs. (Note: This may be provided by Engineer, Construction Manager, General Contractor Or Cost Estimator.)

c. CONSTRUCTION DOCUMENT PHASE (Based on approved design development Phase)

* (1) Additional Studies for: - HVAC (List) - Electrical (List) - Sanitary (List) - Vertical Transportation (List) - Automation (list) - Fire and Life Safety (List) - Security (list) - Communications (List) -Other (List) (2) Final Specifications and

P3 OF 7.( CONTINUING). PAI PIN CHEN.