DATE: JULY 4TH. THURSDAY, 2019.
HAPPY BIRTHDAY, UNITED STATES OF AMERICA ON TODAY. CONGRATULATIONS.
I.
TODAY, HAPPY BIRTHAY OF UNITED STATES OF AMERICA,
234 YEARS OLD.AND 34 YEARS AFTER THE BIRTHDAY YEAR IN YEAR 1986, HAD GREATEST WORLDWIDE
SHIPS CAME IN/ON THE MANHATAN RIVERS , NEW YORK BAY AREAS, AND CREATED AND PERFORMED THE MOST BEAUTIFUL
SHIPS PARADE ON THE DAY JULY 4TH., IN YEAR 1986.
II.
CONGRATULATIONS!
III.
KEY WORDS FROM OUR, MY WOFE, MY SON AND MYSELF,
IN MIND AND HEART:
A.MOST POPULAR.
B.
MOST WONDERFUL.
C.
MOST FAMOUS.
D.MOST POWERFUL.
E.
MOST SPECIAL.
F.
MOST THANKFUL.
IV.
FOR MY CONCERNS, MY ACTIVITIES, MY INTENSIONS, MY
WILL AND HOPE FROM NOW AND THEN, MEANS DURING YEARS FROM YEAR 2019 UP TO YEARS
2020, 2021,2022,2024, 2025, AND THE FOLLOWING YEARS UP TO YEAR 2029, 2030, ETC.,
I AM, I SHOULD, I SHALL BE, I WILL BE BACK TO MY TIME PERIODS DURING YEARS
1972-1975, 1979-1988, 1988-1990, 1991, JANUARY-OCTOBER 31ST.
V.
THE ACTIVITIES WHAT I HAD DONE AS SHOWN BELOW.
VI.
THANK YOU VERY MUCH.
Philip Pai-Pin Chen, P.E.
Professional Experience:
1. Far-Eastern Plaza
,Taipei Taiwan:
Partial Project Coordination
2. Cogeneration
power plants Promotiom Task:
Approx. 120 cogenerator units could be
installed in Taiwan
and may produce 350MW electricity.
3. Methodist
Hospital,New York City, U.S.A:
2000 KW Gas-Fired Cogeneration plant
electrically
parallel with Con-Ed power network
4. Hofstra
University,Hempstead,New York,USA:
2700 KW gas-fired cogeneration power plant
5. E.R. Squibb &
Sons,Inc.Lawrenceville,New Jercy,USA:
Large High-Tech Building complex and
labortory,10MVA
central utility power plant and associated
distribution.
6. Goldman Sachs
& Company, Broad Street,New York:
10MVA electrical system and super computer
data center
7. IBM Customer
Executive Education center,Palisades,New
York,USA:
Building complex/Office + Show Room+Computer
data
center+Class Rooms+Studos+Hotel
9,000KVA Electrical System /Three Unit
Sub-Stations
8. Morgan Bank,New
York City,U.S.A:
60 Floors intelligent office building for
banking and trading.
9. Burroughs-Wellcome,Greenville,North
Carolina,USA:
15MW Cogeneration power plant parrallel with
Electrical
power company.
10.Ciba-Geigi, New Jercy,U.S.A:
High-Tech Factory utility power plant
modification
11.City University of New
York,Bronx,NYC,USA:
Boiler
Plant Control System Replacement
12.Power Station-Rikers
Island,New York City,USA:
27KV/4160V newly built utility power substation
13.ITT Building,52nd.Street,New
york city,U.S.A:
Mechanical and Electrical load analysis for
renovation.
14.Mini-Computer Data
Center,Memphis,Tennesse,USA:
Power
Conditioners provided for computers.
15.Ciba-Geigi, New Jercy,U.S.A:
System
Renovation- Motor Control Center + Gen. Set
16.Mini-Computer Data
Center,Gs&Co.,Bank Of China,
Hong
Kong,China:
17.Super computer data
center,GS&Co.Broad Street,NYC:
7th.&
8th. Floos computer data center with 1,450KW
UPS
System and associated mechanical system.
18.Super Computer Data
Center,GS&Co. Brookly,USA:
4,000KW UPS and Mech.Syatem.
19.Residential Building
Complex,66th.Street,NYC,USA:
Boiler
Plants Modification
20.Public Service
Building,Manhattan Downtown,USA:
Gas-Fired chiller plants replaced with
electrical driven
type.
21.Bank Of China,Hong Kong,
China:
87
floos building designed by Mr. I.M Pei @NYC
Electrical Distribution
System:11KV-Primary/346/200V.
Distribution System with 2,000KVA,1,500KVA,
1,000KVA,and 750KVA Unit Substations located
on
certain mechanical floors.
22.Tokai Bank,World Trade
Center,New York City,USA:
82nd.floor
tennant with mini-computer data and banking.
23.599 Lexington Avenue,New
York City,USA:
72
Floors high rise building/each floor provided with
metering devices.
24.Irving Trust Bank,New York
City,USA:
Large
Computer Dater Center with 3,000KW UPS,
Electrical Distribution-5KV Primary/480/277V
Secondary.
High-Tech. Intelligent Building
25.7 Hanover ,Low
Manhattan,USA:
37th.floors
building with trading floors, Electrical System
load-3,500 KW.
26.American Broadcasting
Company, Studio 23/24,NYC:
Heavy
Lighting with dedicated control system.
27.High-Tech Building
Complex,Maryland,USA:
Large
area building complex with office building and
high-tech. Lab.
Power
Co. Sub-station-50 MVA/110KV/13.8KV.x2sets.
Double-Ended
Unit Sub-stations-2,500 KVA/12units.
Gas
Turbine Type Emergency Power system-25MW.
28.Satelite Operation Station,
Cambridge,Masschusset,USA:
Ground
Station for System Control and Operation
29.Pitney
Bowes,Headquater,Connecticut,USA:
Building designed by Mr.I.M.Pei
Electrical Load-4,000KW
30.Philip Morris Inc.,42nd.Street,New
York City,USA:
36
floors building,Electrical Load-5,000 KW.
31.General Services
Administration,PBS,Washington,DC:
32.Technical
Facility,Headquarter Complex, The Coca
Cola Conpany ,Atlanta,Geogia,USA:
Electrical Load-9,000 KW
37. Office Building,Coca Cola
Company,Atlanta,Geogia,USA
Electrical Load-8,000KW
38.Swiss Bank,New
York City,USA:
Dedicated computer data center for banking
and trading.
39.Bankers Trust,
Large Computer Data Center,NYC,USA:
UPS
System Function Analysis
40.Chemical
Bank,Water Street,NYC,USA:
3,000KW UPS System
41.Morgan Guarranty
Trust Company,Tennants Floors,NYC,USA:
Tennant Floor Renovation for offices in
downtown area.
42.Sears Tower,36th.Floor,Chicago,USA:
Mech. & Elec. System and floor plan
Renovation.
43.New York
Hospital,Generator Plant Modification(Partial).
44.New York Hospital
(Partial Mechnical Room Renovation).
45.Building Complex
Development,Chao-Tung,NanTo Hsien,Taiwan
Large Area development project-Incomplete.
46.Taichung 7th.Term
Area DevelopmentProjects , Taichung
,Taiwan: City Hall-Energy Study.
47.Formosa Native Culture Village,Chang Hua,Taiwan
Large area developed for playland with
rides/shows/
attractions/food/refreshments/games/etc.
Primary electrical system modification
(Technical
Assistance)
JULY 4TH., THURSDAY, 2019.
FILED.
No comments:
Post a Comment