ieee.mobi,leee.mobi,NYSEASIA.com,Good days worldwide

June 8th.,2010

Say Hi!

Nice everyday!

Ieee.mobi,PPC,P.E.
SFL,leee.mobi
Mission Critical & Essential.com
Music Essential,Broad,Worldwide
Dot,Optical,Pacific Rims, A+A,Worldwide

Wednesday, June 12, 2019

SEVERAL PHOTOS TAKEN WHEN USA HAD ,HAVING 200 YEARS OLD WITH SHIPS FESTIVAL IN MANHATTAN AREAS.

THANK YOU VERY MUCH.
IN THESE DAYS, THANKS AGAIN TO GOOGLE-BLOGGER AND MY FACEBBOK, ETC., INTERNET, IN USA, LOCAL, NATIONAL, WORLDWIDE.
NOW I AM BACK TO MY PROFESSIONAL WORKING TIME, PERIOD AGAIN, FROM NOW AND COMING YEARS, 2019, 2020, 2021, 2024, 2025-2028, ETC.
WITH MY BEST WISHES AND HOPE VIA MY BRAIN IN MY HEARD AND IN MY MIND AND HEART IN MY MENTAL AND PHYSICAL BODY.
SEE.
MY POSTING AT THIS MOMENT.
THANKS.

DATE: JUNE 12, WED., 2019.


PAIPIN CHEN.


PAI-PIN CHEN, P.E.


JAROSBAUMBOLLES.COM.


PHILIP PAI-PIN CHEN, P.E.


SYSKAHENNESSY.MOBI.


NYSEASIA NY


NYPEASIA, NYCEASIA, PAI PIN CHEN, INTERNET.


V. CHEN.


HIGHTECHSCIENCEPARK.COM.


SYOU FEN LEE CHEN.


MSM, MANHATTAN SCHOOL OF MUSIC, NEW YORK CITY, NY, USA.


NYSEASIA@GMAIL.COM.


NYSEASIA@AOL.COM.


NYSEASIA@HOTMAIL.COM.


NYSEASIA@YAHOO.COM.


IEEEMOBIPPCPE@GMAIL.COM.


NYCCHINA888@YAHOO.COM.TW


DOTOPTICALWW@YAHOO.COM.TW


MISSION CRITICAL TECH. CO-FOUNDER, DIRECTOR, PACIFIC RIM, ASIA, DURING YEARS 1993-2003.


SEE, SEEING ONE OF MY MANY PROJECTS AS SHOWN BELOW.


HIGHLY APPRECIATED.


PLEASE NOTE:


THE MOST WORDS IN ENGLISH, ONLY THE KEY WORDS REGARDING THIS PROJECT IN/ON CHINESE WORDS.


OKAY.         


   TAICHUNG TOWER II  台中京唐洲際大飯店

MEMO. #7    August. 1, 1999




                       Project Checking (專案查核)

All drawings MUST be checked for technical correctness and physical coordination prior to issue for approval. The Project Principal (專案主管) should not allow a project to proceed into construction before it is checked.



The Physical(尺寸大小形狀體積等等) coordination check should be performed by the design team (設計工作 )in the Production Group at the same time the technical check is done.  This should occur irrespective(同時) of where the technical check is performed.



Scope of Technical Check

A.     The responsibility of the Checkers is to seek out and highlight any

   Inconsistency, ambiguity, omission or error in the plans and specifications. It is not intended for the checker to redesign any portion of the work.  This responsibility is the function of the design groups and the respective Project Engineers.

B.      The following broad functions are to be performed:

1.       Check calculations for sizing of all equipment.

2.       Spot-check pipe, duct and wiring sizes.

3.       Review specifications and indicate errors and omissions, including inter-trade coordination and specified manufacturers.

4.       Review plans and indicate errors, omissions and inter-trade engineering coordination.

5.       Compare specifications to plans, including standard details, and indicate any errors or omissions.

6.       Check system continuity between floor plans and riser and flow diagrams.

7.       Check for code compliance.

8.       Check for compliance with outside consultants’ recommendations (i.e.,

    Acoustics, water treatment).

9.       Comment on drafting quality conformance with drafting standards.



Scope of Physical Coordination Check

The Physical or space coordination check remains the responsibility of the Production Group. The following broad functions are to be performed:



A.     Piping and ductwork are coordinated and fit into hung ceiling areas.

B.      Required steel cuts are identified on both our drawings and the structural drawings.

C.      Adequate sections are shown on our drawings in scale for tight areas.

D.     Shaft and pipe spaces are adequately sized and are identified on the architectural

And structural drawings

E.      Clearance below piping and ductwork in areas without hung ceilings is adequate.

F.       Mechanical equipment rooms are adequate in size to allow for the space required by the specified equipment and components.

G.     Walls and floors are adequate in depth to conceal components indicated to be recessed.



Procedure for Checking

Name List of Project Checking:



Field Observation Report – From June 1 up to July 29, 1999

01

02.

03.

   A.

   B.

   C.

      1.

      2.

      3.

        a .

        b.

        c.

           1).

           2)

             a).

             b).

File #7. FOR.07.01.08.99

Cc: Mr.Wang/宗唐,Mr.Yeh/宗唐.

RE-POSTING ON JUNE 12, WED., 2019.

PAI-PIN CHEN, P.E.

JAROSBAUMBOLLES.COM.

PHILIP PAI-PIN CHEN, P.E.

SYSKAHENNESSY.MOBI.

NYSEASIA.TV

NYSEASIA.US.

FILED.

No comments:

Post a Comment