IN THESE DAYS, THANKS AGAIN TO GOOGLE-BLOGGER AND MY FACEBBOK, ETC., INTERNET, IN USA, LOCAL, NATIONAL, WORLDWIDE.
NOW I AM BACK TO MY PROFESSIONAL WORKING TIME, PERIOD AGAIN, FROM NOW AND COMING YEARS, 2019, 2020, 2021, 2024, 2025-2028, ETC.
WITH MY BEST WISHES AND HOPE VIA MY BRAIN IN MY HEARD AND IN MY MIND AND HEART IN MY MENTAL AND PHYSICAL BODY.
SEE.
MY POSTING AT THIS MOMENT.
THANKS.
DATE: JUNE 12, WED., 2019.
PAIPIN CHEN.
PAI-PIN CHEN, P.E.
JAROSBAUMBOLLES.COM.
PHILIP PAI-PIN CHEN, P.E.
SYSKAHENNESSY.MOBI.
NYSEASIA NY
NYPEASIA, NYCEASIA, PAI PIN CHEN, INTERNET.
V. CHEN.
HIGHTECHSCIENCEPARK.COM.
SYOU FEN LEE CHEN.
MSM, MANHATTAN SCHOOL OF MUSIC, NEW YORK CITY, NY, USA.
NYSEASIA@GMAIL.COM.
NYSEASIA@AOL.COM.
NYSEASIA@HOTMAIL.COM.
NYSEASIA@YAHOO.COM.
IEEEMOBIPPCPE@GMAIL.COM.
NYCCHINA888@YAHOO.COM.TW
DOTOPTICALWW@YAHOO.COM.TW
MISSION CRITICAL TECH. CO-FOUNDER, DIRECTOR, PACIFIC RIM, ASIA, DURING YEARS 1993-2003.
SEE, SEEING ONE OF MY MANY PROJECTS AS SHOWN BELOW.
HIGHLY APPRECIATED.
PLEASE NOTE:
THE MOST WORDS IN ENGLISH, ONLY THE KEY WORDS REGARDING THIS PROJECT IN/ON CHINESE WORDS.
OKAY.
TAICHUNG TOWER
II 台中京唐洲際大飯店
MEMO. #7 August. 1, 1999
Project Checking (專案查核)
All drawings MUST be checked for technical
correctness and physical coordination prior to issue for approval. The Project
Principal (專案主管) should not allow a project to proceed into construction before it
is checked.
The Physical(尺寸大小形狀體積等等)
coordination check should be performed by the design team (設計工作 組)in the
Production Group at the same time the technical check is done. This should occur irrespective(同時) of where
the technical check is performed.
Scope of Technical Check
A.
The responsibility of the
Checkers is to seek out and highlight any
Inconsistency, ambiguity, omission or error in the plans and specifications. It is not intended for the checker
to redesign any portion of the work.
This responsibility is the function of the design groups and the
respective Project Engineers.
B.
The following broad functions
are to be performed:
1.
Check calculations for sizing
of all equipment.
2.
Spot-check pipe, duct and
wiring sizes.
3.
Review specifications and
indicate errors and omissions, including inter-trade coordination and specified
manufacturers.
4.
Review plans and indicate
errors, omissions and inter-trade engineering coordination.
5.
Compare specifications to
plans, including standard details, and indicate any errors or omissions.
6.
Check system continuity between
floor plans and riser and flow diagrams.
7.
Check for code compliance.
8.
Check for compliance with
outside consultants’ recommendations (i.e.,
Acoustics, water treatment).
9.
Comment on drafting quality
conformance with drafting standards.
Scope of Physical
Coordination Check
The Physical or space coordination check
remains the responsibility of the Production Group. The following broad
functions are to be performed:
A.
Piping and ductwork are
coordinated and fit into hung ceiling areas.
B.
Required steel cuts are
identified on both our drawings and the structural drawings.
C.
Adequate sections are shown on
our drawings in scale for tight areas.
D.
Shaft and pipe spaces are
adequately sized and are identified on the architectural
And structural
drawings
E.
Clearance below piping and
ductwork in areas without hung ceilings is adequate.
F.
Mechanical equipment rooms are
adequate in size to allow for the space required by the specified equipment and
components.
G.
Walls and floors are adequate
in depth to conceal components indicated to be recessed.
Procedure for Checking
Name List of
Project Checking:
Field Observation Report –
From June 1 up to July 29, 1999
01
02.
03.
A.
B.
C.
1.
2.
3.
a .
b.
c.
1).
2)
a).
b).
File #7. FOR.07.01.08.99
Cc: Mr.Wang/宗唐,Mr.Yeh/宗唐.
RE-POSTING ON JUNE 12, WED., 2019.
PAI-PIN CHEN, P.E.
JAROSBAUMBOLLES.COM.
PHILIP PAI-PIN CHEN, P.E.
SYSKAHENNESSY.MOBI.
NYSEASIA.TV
NYSEASIA.US.
FILED.
No comments:
Post a Comment