ieee.mobi,leee.mobi,NYSEASIA.com,Good days worldwide

June 8th.,2010

Say Hi!

Nice everyday!

Ieee.mobi,PPC,P.E.
SFL,leee.mobi
Mission Critical & Essential.com
Music Essential,Broad,Worldwide
Dot,Optical,Pacific Rims, A+A,Worldwide

Saturday, May 12, 2018

I AM HAVING VERY GOOD DAYS LATELY, BUT I RECEIVED THE WORDS AS "BLOCK" AND " STOP" IN TWO DEVICES, ONE PAD, ONE NB, SO.


DATE: MAY 13TH. SUNDAY, 2018.

NYSEASIA, NYPEASIA, .NYCEASIA.

PAI PIN CHEN, INTERNET.

THANKS.

DRAFT, REVISED AND UPDATED REQUIRED.

          

 TABLE OF CONTENTS (NOT FOR CONSTRUCTION, AND ANY OTHER PURPOSES).



SECTION                                     TITLE



     I                      PURPOSE AND SCOPE OF MANUAL                              Page



                            A.   Purpose                                                                           I-1

                            B.   Scope                                                                              I-1



   II                       LEGEND                                                                              II-1



   III                     DESCRIPTION OF POWER SYSTEM



                            A.   Arrangement                                                                   III-1

                            B.    12.47 KV Primary Switchgear "S"                                III-1

                            C.    Main Transformers                                                        III-1

                            D.    Generators                                                                     III-1

                            E.     Low Voltage Switchgear “LVS"                                  III-1

                            F.     Generator / Device Switchgears “GDS"                      III-2

                            G.    Technical Bus Switchgears                                          III-2

                            H.    Generator Control Cubicles                                         III-3

                            I.      Generator Metering Cubicles                                       III-3

                            J.      Uninterruptible Power System                                     III-3

                            K.     Protective Relaying                                                     III-4

                            L.      Metering and Operators Devices                                III-5

                            M.    Battery System                                                            III-7

                            N.     Main Panelboard                                                         III-7

                            O.     Power Monitoring System                                           III-8

                            P.      Grounding System                                                       III-9

        



        IV                OPERATION OF POWER SYSTEM

    

                            A.     Normal Operation                                                       IV-1

                            B.     Abnormal Operation                                                    IV-2

                            C.     Parallel Operation                                                       IV-3

                            D.     Low Voltage Switchgear "LVS"                                  IV-3

                            E.     Generator / Device Switchgear "GDS"                        IV-7

                            F.     Technical Bus Switchgears                                          IV-13

                            G.     Relaying                                                                       IV-18

                            H.     Draw out Air Circuit Breakers

                            I.      Uninterruptible Power Systems                                    IV-19

                            J.      Main Panelboard                                                          IV-21

                            K.     Power Monitoring System                                            IV-21

                            L.      Grounding System                                                        IV-22



         V                MAINTENANCE OF POWER SYSTEM



                            A.     Medium Voltage Switchgear                                        V-1

                            B.     Transformers                                                                V-1

                            C.     Low Voltage Switchgear                                              V-2

                            D.     Uninterruptible Power System                                      V-5

                            E.     Main Panelboard                                                           V-6

                            F.      Power Monitoring System                                            V-6

                            G.     Grounding System                                                         V-7

                            H.     Busways                                                                        V-7

                            I.       Molded Case Circuit Breakers                                      V-8

                            J.      Schedule of Periodic Inspection and Maintenance         V-8



         VI               INDEX OF EQUIPMENTY SHOP DRAWINGS

                            AND OPERATING MANUALS                                           VI-1



         VII              INDEX OF AS BUILT DRAWINGS                                      VII-1







         PPC @

         ADSC.PCA.MCTI international

                           

陳栢彬,陳栢彬.net, 陳柏彬.com;

工程師.com; 電機技師.com;

專業工程師;中台房地產.com;

05132018. SUNDAY.

FILED.

                                                        

                           

No comments:

Post a Comment