ieee.mobi,leee.mobi,NYSEASIA.com,Good days worldwide

June 8th.,2010

Say Hi!

Nice everyday!

Ieee.mobi,PPC,P.E.
SFL,leee.mobi
Mission Critical & Essential.com
Music Essential,Broad,Worldwide
Dot,Optical,Pacific Rims, A+A,Worldwide

Wednesday, February 28, 2018

PRINCETON UNIVERSITY, FIRST TIME I CAM IN YEAR 1975, OCTOBER, THE LAST TIME I ENJOYED MY VISITING ON JANUARY 26TH., 2018, PAI PIN CHEN.


DATE: March 1, 2018, THURSDAY.

SPECIAL SERVICES, ENGINNERING AND TECHNOLOGIES, PAI PIN CHEN, MISSION CRITICAL TECH. 03012018.

NYSEASIA, NYPEASIA, NYCEASIA, PAI PIN CHEN.

INTERNET, BUSSINESS, ECONOMICS, AND POLITICS, NOW AND THEN, USA, ASIA, EUROPE, ETC., LOCAL, NATIONAL, WORLDWIDE.

陳栢彬,陳栢彬.net, 陳柏彬.com;

工程師.com; 電機技師.com;

專業工程師;中台房地產.com;

P5 OF 7.



Special Service and The fee should be adjusted based on % of Construction cost to

Cover other aspects of work (I. e., Coordination, Shop Drawings, field Observations, etc.). Where project is Lump Sum, or Time Card to Upset, preparation of Change Orders whether constructed or not is a special Service. g. Services in connection with evaluating Substitutions proposed by Contractors after Award of contract. h. Making revisions to Drawings and/or Specifications related to the substitutions. I. Providing coordination of work performed by separate contractors. J. providing quantity surveys and detailed Construction Cost Estimates. k. Providing services in connection with the Work of a construction manager or other Consultants retained by Owner. l. Providing services related to the start-up of M/E Systems. m. Preparing to serve or serving as an

Expert witness In connection with any public hearing, arbitration or legal proceeding. n. Preparing Operations and maintenance Manuals. o. Analyzing maintenance and operating costs for Project or portion of project. p. Providing training of personnel for operations And Maintenance. q. Providing consultation services after completion Of Construction phase and final acceptance (Including follow-up field observation, preparing Follow-up punch lists, etc.). r. Preparing energy analysis subsequent to occupancy. s. Designing of Mock-ups, Samples and Demonstration Models including their construction and demolition Costs. T.

Services of Special Consultants For:

(1)   Acoustics (2) water Treatment (3) Cost Estimating (4) Laboratory Tests (5) Electrical Tests (Electromagnetic Interference, etc.) (6) Structural (7) Architectural (8) Other u. All reimbursable costs, including travel time for the above (Or any other additional Special Services). 4. Field Services The services described in Paragraphs 2 and 3 will Cover the following fields: Note: Where Special systems are to be included, they should be reviewed with the Engineering Policy Committee. a. Mechanical Engineering (1) Air conditioning (2) Heating (3) Ventilating (4) Boiler plant (5) Refrigeration Plant (6) Site Distribution piping for: (7) Special Systems Note: The inclusion of the following Will either increase the basic fee or Treated as special Services. -Solar Energy -Energy Storage (ice, Chilled Water, hot water, etc.) -Heat Recovery -Process Piping -Automation and Control (can be provided under Automated monitoring and Control Services) -Design for Atriums, Malls or other special areas. Note: Requirements for special smoke control systems. -Humidity Control -Clean Room Laminar Flow Systems (Class to be determined) -Other b. Electrical Engineering (1) Incoming Service (2) Interior Distribution (3) Telephone

P5 OF 7.

CONTINUED.

PARTIAL.

CC: 陳栢彬,陳栢彬.net, 陳柏彬.com;

工程師.com; 電機技師.com;

專業工程師;中台房地產.com;

March 1, 2018, THURSDAY.

FILED.

No comments:

Post a Comment