ieee.mobi,leee.mobi,NYSEASIA.com,Good days worldwide

June 8th.,2010

Say Hi!

Nice everyday!

Ieee.mobi,PPC,P.E.
SFL,leee.mobi
Mission Critical & Essential.com
Music Essential,Broad,Worldwide
Dot,Optical,Pacific Rims, A+A,Worldwide

Thursday, April 12, 2018

TEN PAGES OF WORDS, WITH THE DRAFT OF CERTAIN FIELDS, SEE CAN BE POSTED IN HERE, THANKS SINCE YEAR 2007 WITH YOU. 04122018,CHECKING.

PLEASE NOTE:
THE POSTING NOT FOR ANY PURPOSES.
DRAFT, REVISED AND UPDATED REQUIRED.
THANKS.
10 PAGES, MORE OR LESS.
SEE AND CHECKING.

Date: July 29, 2015

Philip Pai-Pin Chen

Please note:

These information Original, Wrote, Copy and shown in year 1999-2000, and posted in year 2007, Materials shown below not for any purposes.

“Words shown to be reviewed and checked again-if you interested”.

Thanks-Philip Pai-Pin Chen

Draft:

“NOT For Construction”.

Revised and updated required.

Attention please:

I.                  Please contact me via nyseasia@gmail.com and concerns for your coming and existing projects, local, national and worldwide.

MissionCritical.com

FaceEssential.com.

NYEssential.com

BateryAssociates.com

Mechanical & Electrical Engineering, Professionals and consultants, USA, Asia & Worldwide.

II.                Materials shown below Not for any purposes.

III.               Thanks- Philip Pai-Pin Chen-dated on February 21, 2015.

April 9th, 2007(First issued in year 2007 or later)

Can we get there from here?

Do right things, Do things right! Do right time!

 Hi! Guys, gals, & Folks, and me too!

IEEE.mobi, NYSEASIA US.

Subject: “M&E Design Data Bank”

RE: Gen.Set

HVAC questionnaire to be issued to Electrical Department

Project:

Date:

HVAC Project Engineer:

Electrical Project Engineer:

A.            Engine

1.            Engine Generator Capacity (full load KW)

2.            Type of Engine:

a.            Gas.

b.            Diesel.

c.            Turbine.

d.            Other.

3.            Engine generator make design will be based on:

4.            Engine generator overall sizes:

a.            Length:

b.            Width:

c.            Height:

5.            Number of engines generators working simultaneously:

B.             Fuel System

1.            Is transfer pump part of and mounted on engine?

a.            Max. Total suction head (ft) (lift and line resistance)

b.            Capacity (gpm)

2.            a.   Is day tank part of engine:

c.            size:

d.            Controls furnished with day tank:

(1)            High Alarm

(2)            Pump Off.

(3)            Pump on.

(4)            Low Alarm.

e.            Pipe connection sizes:

(1)            Suction.

(2)            Return.

(3)            Overflow (if Required).

3.            Day tank furnished separately:

4.            Size per engine (gal)

5.            Fuel oil pumping rate per engine.

6.            Type of fuel.

7.            Other:

C.            Radiator

1.            Radiator & fan mounted on engine block skid (engine drives radiator fan).

a.            Comes all inter-connecting piping between radiator & engine with the unit.

b.            If not what external piping has to be furnished?

c.            Are vibration isolators for engine block skid to be furnished separately?

2.            Radiator and fan remotely located from engine (but in same room).

a.            Radiator cooling water pipe connecting sizes.

b.            Cooling water flow:   gpm

c.            Location of radiator.

d.            Radiator make design will be based on:

3.            Radiator and fan remotely located from engine (outside of engine room).

a.            Location.

b.            Elevation of radiator in relation to engine (ft.).

c.            Radiator cooling water pipe connecting sizes.

d.            Cooloing water flow (gpm).

4.            What equipment is part of radiator?

a.            Surge tank.

b.            Ventiline from radiator to surge tank.

c.            Vacuum breaker.

d.            Thermometer wells.

e.            If surge tank is not part of radiator furnished by radiator manufacturer what size is required?

D.            COOLING WATER SYSTEM

1.            Volume

a.            Engine only (gall.)

b.            Radiator for max. ambient of 110 deg. F.

c.            Radiator for max. ambient of 125Deg. F. (gal).

2.            Water pump performance (pump furnished with engine).

a.            Is pump mounted on the engine.

b.            Jacket water

(1)   capacity at     ft.. (gal)

(2).   Capacity at    ft.

(4)            Maximum allowable static head (ft).

(5)            Cooling water pipe connecting sizes.

(6)            Internal pressure drop through equipment.

3.            Auxiliary water

a.            Lub oil cooler.

(1)   Capacity at    ft.   (gal).

(2)                Capacity at 0 ft  (gal).

(3)                Max. allowable static head (ft).

(4)                Cooling water pipe connecting sizes.

(5)                Internal pressure drop through equpment (ft).

         b.,   Other (     )

              (1)   Capacity at    ft.  (gal).

(2)            Capacity at 0 ft .  (gal).

              (3).   Max. allowable static head (ft).

(3)            Cooling water pipe connecting sizes.

(4)            Internal pressure drop through equipment (ft).

4.            Maximum system pressure (psi).

a.            Water jacket.

b.            After cooler.

c.            Radiator.

d.            Lub oil cooler.

e.            Other (   )

5.            Can heat exchange be mounted on the engine and be part of it?

a.            Size.

b.            Capacity.

c.            Connecting pipe sizes.

E.             Heat Rejection

1.            To jacket water (including standard mainfold, after cooler, oil cooler )

(Btu/min)

2.            Maximum jacket water temperature (Deg.F).

3.            Radiator data

a.            Air flow through radiator with air entering radiator at:

(1)            95Deg.F  (CFM)

(2)            105 Deg.F. (CFM)

(3)            110 Deg.F. (CFM)

(4)            120 Deg.F (CFM)

l      HVAC design guide calls for 110deg. F. entering temperature when radiator is in the same room as tne engine.

b.            Maximum allowable external static pressure at discharge side of radiator (in”).

F.             ENGINE ROOM VENTILATION REQUIREMENTS

1.            COMBUSTION AIR REQUIREMENTS AT 85Deg.F.

2.            Heat radiated by engine   (btu/min)

3.            Heat dissipated by generator (Btu/min).

4.            Ventilation requirements (based on 15Deg F. Delta T) (CFM) (engine and generator radiated heat only).

G.            EXHAUST SYSTEM

1.            Gas Volume  (CFM).

2.            Gas temperature (Deg.F).

3.            Max. permissible back pressure (in).

4.            Exhaust pipe size connection at engine.

5.            Exhaust pipe size based on:

a.                                ft straight horizontal pipe.

b.                                Ft vertical pipe.

c.                                Elbows.

6.            Muffler Data

a.            Size.

b.            Weight.

c.            Flexible Connection (by whom).

7.            Exhaust stack size bases on:

a.                number of engines operating simultaneously.

b.                    Ft straight  horizontal pipe.

c.                Ft   vertical pipe.

d.                Elbows.

8.            Crank-case breather vent piping.

a.                connecting size at engine.

b.                Pipe size.

H.            DIESEL LUBRICATING SYSTEM REQUIREMENTS

1.            Is pump mounted on engine and part of package?

a.            Pump Capacity:

(1)             gpm.

(2)             Head (ft)

2.            Flow gpm.

3.            External pipe size requirements.

4.            Storage or reservoir capacity (gal)

I.               STARTING SYSTEM

1.            Air system.

a.            Min. air pressure required at motor (psi).

b.            Max. air pressure allowed at motor (psi).

2.            Others.

_________________________________________________________

Subject: M&E Design Data Bank

Re: Em. Gen. Set

__________________________________________________________

1.            GENERAL

The intent of this Design Guide is to outline the procedure to follow in designing standby power plants for use as an alternate source of power in the event of failure of the normal electrical service. It does not cover other alternate sources of power which may be required or permitted by Code (i.e., battery system, tapping ahead of main switches of two separate services, etc.). Costs are also not included as they will vary with each project.

2.            CRITERIA

a.            Tabulate the load which is to be on the emergency system. Include the following:

(1)            Minimum emergency loads required or recommended by Code:

(2)            Emergency loads required for standby power plant auxiliary equipment, including:

(3)            ADDITIONAL EMERGENCY LOADS REQUESTED BY Owner.

(4)            Additional emergency loads recommended by Consultants, PPC/ADSC and approved by Owner.

                                    

b.            List the sum of loads from 'a" above as follows:

_____________________________________________________

EMERGENCY LOADS  HP  KW  P.F.  KVA  D.F.  DEMAND

                                                 KVA

______________________________________________________

(a).Sum of incandescent            1.0

lighting loads

(b).Sum of electrical                1.0

heating loads

©. Sum of fluorescent

and mercury loads                  .9

(d). Individual motor

loads (2)

TOTALS

            Conn. HP:    

                     Conn. KW:    

                               Conn. KVA:   

                                         Demand KVA:     

___________________________________________________________

Notes:

(1)            Power factors for motors normally vary from .80 to .95.

(2)            List only the largest motors that are to operate on emergency simultaneously.

(3)            HP x .746/ Motor Efficency = KW; KW/P.F. =KVA;

KVA x D.F. = Demand KVA

P.F. (System) = KW ( Conn. )/ KVA ( Conn. )

c.            Using the demand KVA and system power factors obtained in 'b" above, select the generator as fellows:

(1).   Add spare (as required).

(3)              Subtract any loads included in 'b' which will be put on emergency manually only when the load conditions allow it (selective loading).

(4)             Select next higher size generator (continuous rating) available from at least three of the base bid manufacturers listed.

(a)            Ideal.

(b)            Electric Machinery

(c)            Delco.

(d)            G.E.

(e)            Century.

(f)              Westinghouse.

             (5).   Using selected generator, calculate voltage dip due to starting of single motor, ( or simultaneous starting of group of motors) with largest locked rotor KVA. Use manufacturer's tables for calculating dip. If dip exceeds 5%, recalculate based on next higher generator size or investigate use of reduced voltage starters on the motors.

             (6).    Determine generator output voltage by weighing the following factors:

(a)            Normal operating voltage(s) of equipment on emergency.

(b)            Cost, space and weight of transformers.

(c)            Cost of, and spare required for , distributing wiring.

             (7).    Size generator 3 phase main fused switch or circuit breaker as follows:

(a)            Continuous current rating:

I = KVA Gen./(1.732 x E Gen. Line to Line)

(b)            Interrupting Rating: Determine from generator manufacturer maximum three phase fault current available and rate accordingly.

             (8).   Generator grounding : For normal applications , directly

                   grounded wye connection and frame of generator to cold

                   water main or driven ground rods. Where generator line to

                   ground fault current exceeds three phase fault current

                   either:

(a)            Specify generator capable application of withstanding greater fault current and increase interrupting rating of generator  main fused switch or circuit breaker accordingly, or

(b)            Furnish a low-value reactor or resistor in ground conductor which will limit line to ground fault current to a value between 25% and 100% of three phase fault current.

(9)            Check Code regulations on generators:

(a)             Taichung, Taiwan: Article ?

(b)            Taiwan :  NFPA # ?, Article ?

(c)             National: NFPA #? , Article ?

d.              Select engine as follows:

(1)     Determine type of engine and fuel to be specified, using the following as a guide:

     (a).   Diesel engine:  Most commonly used, most familiar to maintenance engineers, large selection of sizes. Howerever, require inertia block. Specifify at highest speed available in order to reduce weight weight and cost. Specify for use with #2 diesel oil (lowest sulphur content fuel commonly available).

(c)            Gasoline Engine:

(d)            Natural Gas:

(e)            Turbine:

(2)   Determine basic engine BHP required for selected  Generator units.

IEEE.MOBI, PAI-PIN CHEN

@ Dot, Optical Pacific Rim, Asia

Jan.03, 2007(FIRST ISSUED).

July 29, 2015, 2015 (third issued).

Filled. ieeemobippcpeAT Dotcom, nyseasiaworldwide.com.

Email: nyseasia@hotmail.com.NYSEASIA NY,Broad, NY, USA etc.


Wednesday, April 11, 2018

NOW I AM WORKING AS SHOWN IN HERE NYSEASIA, AND THE OTHER PLACES INTERNET, PAI PIN CHEN, THANKS,04112018,WED.


THANK YOU VERY MUCH WITH YOU AND YOU ALL.

Philip Pai-Pin Chen, P.E.

Philip Pai-Pin Chen,P.E.

Nyseasia NY

Paipin Chen.

THIS VIDEO, THE SECOND VIDEO OF FOUR (4) VIDEOS WILL BE POSTING IN THESE DAYS. THANKS.

MY WORDS REGARDING YOU, ME AND ALL OF US.

DATE: April 11, 2018, WED.

I. I AM WORKING ON MY MESSAGES, INFORMATIONS, DIGITAL MATERIALS SUCH AS THE SIGNALS, KEEP, KEEPING, KEPT IN DISKS, LIKE CD,VCD, VCD,SYM CARDS, USB,WITH 16GB,32GB, 64GB, AND LARGE/HUDGE DIGITAL STORAGE DISKS WITH CAPACITY, 1TB,2TB.

II. THESES DIGITAL SIGNALS, MOSTLY CREATED AND COPIED SINCE YEAR 1971 WITH PHOTOS, BUT VIDEO TAKEN SINCE YEAR 1980/1981 VIA SONY MADE VIDEO CAMERA,AND UP TO YEAR 2014/2015.

III. TODAY IS MY SPECIAL DAY, DUE I AM CALM, STEADY, FIRMLY TO WORK ON MY WILL, CONCEPTS, MY PLANNING, MY TASKS, MY PROJECTS, ACOORDING MY ABILITIES, CAPACITIES, MY PERFORMANCES, ETC., IN THE PAST, NOW, AND COMING YEARS.

IV. THIS VIDEO TAKEN ON YEAR 2003, VERY IMPORTANT YEAR FOR ME AND OUR FAMILY MEMBERS, SYOU FEN LEE CHEN, AND OUR SON.

V. BY THE WAY, THE SINGER, MR. YANG, GRADUATED FROM MANHATTAN SCHOOL OF MUSIC WITH HIS MASTER DEGREE, AND HE ENJOYED WORKED IN NEW YORK WHITE PLAINS ABOUT ONE YEAR AFTER HE GRADUATED FROM MSM, MANHATTAN SCHOOL OF MUSIC,ON BROADAY/121 STREET, MANHATTAN,NEW YORK CITY,NY, USA.

VI. NOW IN YEAR 2018, SHOULD YOU WANT TO BE IN MANHATTAN, AND LEARNING THE MUSIC ASSOCIATED, YOU ARE INVITED AND QUITE WELCOME.

PAI-PIN CHEN, P.E.

PHILIP PAI-PIN CHEN, P.E.

VII. THE VIDEO POSTING ON TODAY, NOW.

AND

MY WORDS ON APRIL 11TH. 2018.

VIII. MR. YANG SEN ANN, AND HIS VOICE RECIATAL, ON JUNE 23RD. 2003.

MOST POWERFUL.

MOST BEAUTIFUL.

MOST WONDERFUL.

MOST SPECIAL.

MOST THANKFUL.

SMART, SHARP, EXCELLENT, INTELLIGENT AND WISE.

PERFECT.

THE BEST.

PERIOD.

NYSEASIA, NYPEASIA, NYCEASIA

PAI PIN CHEN, INTERNET.

THANK YOU VERY MUCH.

PAI PIN & SYOU FEN CHEN.

IX. MISSION ESSENTIAL AND CRITICAL WORLDWIDE SINCE YEAR 1971.

OPERA, VOICE, MUSIC AND PERFORMING ARTS, LOCAL AND WORLDWIDE.

NYSEASIA@GMAIL.COM

NYSEASIA@HOTMAIL.COM

NYSEASIA@AOL.COM

NYSEASIA@YAHOO.COM

NYSEASIACHEN@YAHOO.COM

IEEEMOBIPPCPE@GMAIL.COM

NYCCHINA888@YAHOO.COM.TW

DOTOPTICALWW@YAHOO.COM.TW

X. HIGHLY APPRECIATED.

CC:

陳栢彬,陳栢彬.net, 陳柏彬.com;

工程師.com; 電機技師.com;

專業工程師;中台房地產.com;

FILED.

Saturday, April 7, 2018

THE REQUIREMENTS FOR SENIOR ELECTRICAL ENGINEER FOR HIS/HER QUALIFICATIONS. THANKS. PAI-PIN CHEN,P.E., APRIL 7TH., SATURDAY,2018.


DATE: April 7, 2018,SATURDAY.

PAI-PIN CHEN,P.E.

PHILIP PAI-PIN CHEN,P.E.

PAI PIN CHEN,INTERNET.

NYSEASIA,NYPEASIA, NYCEASIA.

NOW I AM BACK TO MY TIME DURING YEARS 1996-1999.

THANKS.

WHAT ABOUT:

PRIMARY:

JOB FUNCTION-SENIOR ELECTRICAL ENGINEER

SECONDARY WITH DESCRIPTIONS WITH DETAILS.(draft,revised and updated required).

1.     Information received from Yahoo! Classifieds - Employment dated 1997/4/23 AM

Edison Source; Senior Electrical Engineer; La Puente, CA;

2.     Industry: Utilities and Energy  Function: Engineer.   Department: Engineering

3.     Responsibilities: Report to the Technical Resources Manager, and perform analysis, studies, consultation and review/approve the engineering work of outside consultants,

4. A/E’s and construction firms in the areas of lighting, wiring, electrical distribution and instrumentation control related to HVAC, industrial utilities and other mechanical electrical systems. Other responsibilities will include: * provides technical support to the marketing/sales and project management teams. * Identifies technical opportunities within customer organizations. *Provides technical management of outside service providers, also, reviews and approves results of engineering analysis.*

*provides technical support during the construction phase. *Estimate energy consumption for HVAC, lighting, motors, refrigeration, industrial processes, and co-generation systems. * Interacts with consultants, service providers, customers, and trade organizations.

5. Requirements:* Minimum 10 years of progressive experience in electrical engineering/construction of industrial and commercial facilities with emphasis on energy saving projects.* Extensive knowledge of lighting, wiring, and power distribution system. *BS degree in electrical engineering is required. *Master degree

in electrical engineering and/or professional engineering license in the state of California is desirable. *California “Certified Energy auditor” certificate is beneficial. 6. *good understanding of energy efficiency technologies. *Knowledge of lighting systems design, day lighting strategies and lighting level measurements. * Experience in electrical equipment/system specification, selection, also knowledge of installation and start-up.

7. * Experience working with consultants, A/E’s and contractors/vendors.

*general knowledge of building codes, permit requirements, state and federal energy

efficiency standards environmental regulations. *ability to identify the best opportunity, among various alternatives.

8. *Excellent written and verbal skills. * a self-

starter with a hands-on work style. *Comfortable in a new venture where there is little

structure and a lean organization. *Demonstrated ability to utilize good judgement and

make sound decisions. *computer literate.

9. We offer a competitive salary, incentive bonus, comprehensive benefit program.

More Info: Pstatler@edison-source.com 

10. E-Mail: Pstatler@edison-source.com

11. Contact: PXXl StatXer, 13191 Crossroads Parkway North - Suit 405, L. PuXXte, CA 917XX. 

12. Phone: (310) 463-31XX.  Fax: (310) 463-30XX  Date posted: 3/6/97


FILED.

Friday, April 6, 2018

INTERNET, PAI PIN CHEN, NYSEASIA,NYPEASIA, NYCEASIA, APRIL 7TH., SATURDAY, 2018, MY SENSES AS SHOWN, PARTIALLY.


DATE: April 7, 2018, SATURDAY.

I.                 NUSEASIA, NYPEASIA, NYCEASIA, PAI PIN CHEN, INTERNET.

II.               THE SINGERS, SINGERS, MUSICIANS, AND FRIENDS, LOCAL AND WORLDWIDE.

III.             OLD ASIAN PROVERB:

1. A person doesn’t know but knows that he doesn’t know is a student; teach him.

2. A person who knows but who doesn’t know that he knows is asleep; awake him.

3. But a person who knows and knows that he knows is wise; follow him.

Thank you so much!

IV.            THE POSTING JUST IN MY FACEBOOK FEW MINUTES AGO, WITH MY SENSES, FEELING, AND UNDERSTANDING BACK TO MY TIME SINCE YEAR 1975, SEPTEMBER, IN MANHATTAN, NEW YORK CITY, NY, and UNITED STATES OF AMERICA.

V.              WHAT ABOUT:

1. “Run out your money for you, your family members and your love “is a serious problem for your family members and yourself.

Thank you so much.

2.Money is important for me, for myself, even people won’t know, knowing how i am handling my money issues since Year 1954,1955,...,1959,....,1971,1972-1975, 1977-1978, 1979-1988,1988-2016, 2017, And in year 2018 and coming years.

I’m:

Philip Pai-Pin Chen

Paipin Chen

Philip Pai-Pin Chen

Paipin Chen

Nyseasia NY

陳栢彬

陳柏彬.com

陳栢彬.net

Ps: i am going to post the video of Joint Concert of The Singers and Syoufen Lee Chen, on April 10th.2003.

See should I can do what i am saying via Acer Note Book, Win.10, Microsoft’s software, etc.

Highly appreciated.

PAI PIN CHEN, Internet

NYPEASIA.

Ieee.mobi

PAI PIN & SYOU FEN CHEN

April 7th. Saturday,2018.

Good Weekend USA and Worldwide.

Nyseasiaworld.

Filed.

Thursday, March 8, 2018

NYSEASIA,NYPEASIA,NYCEASIA, PAI PIN CHEN, INTERNET,ETC., SINCE YEAR 2006, EVEN EARLIER, SEE MY WORDS POSTED IN YEAR 2014, AS SHOWN PARTIAL.


DATE: March 9, 2018, FRIDAY.

PAI PIN CHEN

PAI-PIN CHEN, P.E.

PHILIP PAI-PIN CHEN, P.E.

工程師.com, 電機技師.com.

陳栢彬, 陳栢彬.net

KEY WORDS ON TODAY.

I.                 SUN TZU, ONE OF THE THREE SAINTS, IN THE PAST ABOUT 2000 YEARS AGO.

II.               THE WORDS GIVEN BY SUN TZU, VERY SMALL FEW WORDS SHOWN IN HERE IN MY ‘NYSEASIA, NYPEASIA, NYCEASIA, PAI PIN CHEN, INTERNET ETC., “ON TODAY.

III.             WHAT ABOUT.

DRAFT: REVISED AND UPDATED REQUIRED.

1.     Sun Tzu, Chapter VIII (8), “Nine” Variations.Lao Tzu, Chapter 17.partical listed. Rudyard Kipling said: see the attached. Thanks, Philip Pai-Pin Chen



2.     February 26, 2014 Philip Pai-Pin Chen. Nice coming weekend! Lao Tzu, Chapter 17.partical listed. 老子,道德經第十七章. 信不足焉, 有不信焉.



3.     Rudyard Kipling said: Fill the unforgiving minute with sixty second's worth of distance run.



4.      Sun Tzu, Chapter VIII (8), “Nine” Variations. Partial listed. Attention please: The materials shown Not for any purpose.



5.      Draft: Revised and updated required.



6.      For your interests, concerns and for accuracy, please checked and refer to original Chinese text or editions .Thanks.-Philip Pai-Pin Chen.



7.     Cat. 24.18. Five different ways, a general may be afflicted.



8.     Cat. 24.19. “Reckless-Easy to be killed.”



9.     Cat. 24.20. “Afraid of death- easy captured.”



10.  Cat. 24.21. “Choleric- easy provoked”.



11.  Cat. 24.22. “Honor sensitive- easy insulted.”



12.  Cat. 24.23. “His men over-solicitous- easy harassed him.”



13.  Cat. 24.24. Brief: The Five items shown above could be" the common weaknesses of a general?”



14.  Also often created calamitous if conduct a war.



15.   When the army defeated crushing, or the general been killed, most time due the five weakness occurred (applied unawareness).



16.  These five weaknesses of a general –shall be checked absolutely. Lao Tzu, Chapter 56. Partial.



17.   老子,道德經第五十六章. 知者不言, 言者不知.



18.   The one who know the “the Tao of Nature”, Keep humble and keep quiet for his knowing.



19.   The one keep saying his knowing about the “Tao of Nature”, may not know … English translated by Philip Pai-Pin Chen. –



20.   Your guidances, suggestions are invited with many thanks.



21.  Philip Pai-Pin Chen. NYSEASIA Worldwide. Nyseasia us; nyseasia NY



IV.            AFTER ABOUT TWO AND HALF YEARS, NOW I AM WORKING ON MY WORDS I POSTED IN MY INTERNET AGAIN WITH MY CHECKING AND VIEWING VIA WIN.10, MICROSOFT, ASUS HARDWARE, UNDER SYSTEM SECURITY AND PROTECTION BY GERMANY FIRM,ETC.

V.              PAI PIN CHEN,P.E.

VI.            PHILIP PAI-PIN CHEN,P.E.

VII.          陳栢彬

CC: 陳柏彬.com;

工程師.com; 電機技師.com;

中台房地產.com;

PAIPINCHEN.com.

Ieee.mobi; leee.mobi

PowerEssential.com; BatteryAssociates.com

Combat Climate Change Worldwide.

USAHSR.com; TWHSR.com

PowerStationSolar.com; PowerStationWind.com.



More will be shown as my concern.

Thanks.

03092018,FRIDAY.

Filed.

Tuesday, March 6, 2018

ELECTRICITY AND ASSOCIATED, I AM WORKING ON NOW AND THEN, SINCE I WAS TEEN. THANKS. PAI-PIN CHEN, P.E., PROFESSIONAL ENGINEER.


DATE: March 7, 2018, WED.

I.                 NYSEASIA, NYPEASIA, NYCEASIA, PAI PIN CHEN.

INTERNET, LESS POLITICS, MORE BUSSINESS AND ECONOMICS; MORE BUSSINESS AND ASSOCIATED OR LESS POLITICS.

THANKS.

工程師.com; 電機技師.com;

陳栢彬,陳栢彬.net, 陳柏彬.com;

工程師.com; 電機技師.com;

專業工程師;中台房地產.com;

THANK YOU VERY MUCH.

PAI PIN CHEN

II.               I AM A SIMPLE PERSON, BUT I STARTED WORKING ON ELECTRICITY FOR MY HOME FAMILY, MYSELF AND MY PARENT, SISTERS AND BROTHERS WHILE I WAS TEEN.

III. I AM TAKING CARE OF THREE TYPES OF ELECTRICAL SERVICES:

A. NORMAL

B.EMERGENCY

C. CRITICAL

IV. THANKS AGAIN, FROM NOW ON I AM BACK TO MY TIME, YEARS LONG TIME PERIODS:

1. TEEN AGES.

2. 20-22.

3. 23-25-28

4.28-31.

5. 32-42.

6. 42-45.

7. 46-49.

8. ETC.

V. AND THE YEARS, TIME PERIODS:

1971-1974,1975-1978,1979-1984,1985-1987,1988-1990,1991-1992,1993-1996,

1997-1999, 2000-2003, 2006-2016, 2017-UP TO TODAY, MARCH 7TH. 2018.

VI. I AM:

PAI PIN CHEN.

03072018. WED.

PAIPINCHEN.COM.

ELECTRICITY IS ONE OF MY MOST IMPORTANT TERRITORIES.

OK.

VII. WITH YOU AND YOU ALL IN COMING TEN YEARS, AT LEAST.

PAIPINCHEN.COM

PAI PIN & SYOU FEN CHEN.

NYSEASIA@GMAIL.COM.

FILED.