ieee.mobi,leee.mobi,NYSEASIA.com,Good days worldwide

June 8th.,2010

Say Hi!

Nice everyday!

Ieee.mobi,PPC,P.E.
SFL,leee.mobi
Mission Critical & Essential.com
Music Essential,Broad,Worldwide
Dot,Optical,Pacific Rims, A+A,Worldwide

Sunday, April 22, 2018

MY CAPACITY AND ABILITY BACK TO POWER, ENERGY AND ENGINEERING TERRITORIES, NOW AND THEN, HERE MY CONCERS, AS SHOWN PARTIALLY. 04232018.

NYSEASIA,NYPEASIA,NYCEASIA.
PAI PIN CHEN, INTERNET.
THANK YOU VERY MUCH FOR ALL.
MAKE MY GOOD DAYS LATELY.
SEE COMING DAYS.

DATE: April 23, 2018, MONDAY.

I.                 THESE PHOTOS TAKEN ON EARTH DAY, YESTERDAY, APRIL 22ND. SUNDAY, 2018 IN THE AREA, DAJIA “TSENG LAN “TEMPLE, BY ME.

II.               I AM: PAI PIN CHEN

III.             I TOOK A VIDEO SPENT ABOUT 10 MINUTES, BUT I POSTED THREE TIMES WON’T BE SHOWING IN HERE IN MY FACEBOOK, DUE IN THE VIDEO, I TOOK YESTERDAY, AFTER RECORDING 5 MORE MINUTES, I CHECKED THE VIDEO OF TEMPLE FLOWERS CARS AND PEOPLE “OUT OF LOOKS”, SO THE VIDEO INTERRUPTED AND DUMPED BY THE “I-P” MOBIL UNIT, WHICH I BOUGHT ABOUT 3 AND HALF YEARS AGO.

THANK YOU SO MUCH.

IV.            IN THE LAST FEWW DAYS, I POSTED THE VIDEOS I TOOK SINCE YEAR 1986/1987, AND UP TO 2009. BUT ACTUALLY THE VIDEOS I TOOK, TAKEN CONTINUED UP TO YEAR 2014/2015, SEE WHAT I AM SAYING NOW.THANKS.

V.              NYSEASIA, NYPEASIA, NYCEASIA, PAI PIN CHEN, INTERNET.

PLEASE NOTE:

THE FOLLOWING MATERIAL, WORDS NOT FOR ANY PURPOSEWS.

RECOD OF ACTIVITIES IN THE PAST DURING YEARS 1985-1987.

DRAFT, REVISED AND UPDATED REQUIRED.

OCTOBER 7, 2011

CloudAsia.us, PPC, P.E.

Mechanical & Electrical

Local & Global

------------------------------------------

Public Services, Local & Metro.

HWG, COMM.



                  LETTER OF TRANSMITTAL



To: Mr. ID                      Date: October 7, 2011

    Ramiro & Gene Co.LTD        Project: C236-7693, SUB-Stations

    988 AOA, NYC, USA          Sub-station, Off-Shore Island, NYS

ATTN.: Mr. Otto Wilson, Jr.

           Project Manager

Gentlemen:

We are sending you the following:

( ) Prints               ( ) Letter                 ( ) Memorandum

( ) Shop Drawings       ( ) comments              ( )           

DESCRIPTION:

              Enclosed please find, for 100% final phase,

1. -   Construction plan review comments,

2.    Comments from landscaping section, and

3.    Drawing # L-2, “site Details” for reference.

Remarks:   additional comments are to be submitted next week.

THE ABOVE ARE:

( ) AS PER YOUR REQUEST    ( ) DISAPPROVED    ( ) FOR APPROVAL

( ) FOR YOUR INFO      ( ) APPROVED        ( ) FOR DISTRIBUTION

( ) FOR COMPLIANCE    ( ) APPROVED AS NOTED ( )          

TRANSMITTED VIA:  ( ) MAIL   ( ) MESS.    ( ) BY HAND

COPIES TO:

1.                                  SIGNED

2.                                  Title:

FILE                                Phone No.

File#:ieeemobippcpeSubstatiom28KV-5KV, 15-20MVA.10072011.

REVIEWING, CHECKING, AND WORKING IN THIS TIME AND COMING FIVE YEARS AND MORE YEARS.

PAIPINCHEN.COM, CHENPAIPIN.COM, INTERNET

NYSEASIA, NYPEASIA, NYCEASIA.

ENERGY, POWER, OILS, GAS, TELEPHONES, COMMUNICATIONS, WEBSITES, NETWORK, EQUIPMENTS, PEOPLE, PERSON, GUY, GENTLEMEM, LADIES, SHE,HE, I, US, WE, THEY, THEM, THEIR, OUR, MY, MYSELF,ETC.

CC: 陳栢彬,陳栢彬.net, 陳柏彬.Com;

工程師.com; 電機技師.Com;

專業工程師;中台房地產.Com;

04232018,MONDAY.
FILED.

Wednesday, April 18, 2018

PEACE PRIORITY, ASIA, USA AND WORLDWIDE, TODAY APRIL 18TH., WED., 2018, VERY IMPORTANT DAY, TIME FOR ALL OF US. THANKS.


DATE: April 18, 2018, WED.

NYSEASIA, NYPEASIA, NYCEASIA

PAI PIN CHEN, INTERNET

PAI PIN & SYOU FEN CHEN.

I.                 ON TODAY, TWO SPECIAL THINGS HAPPENED, HAPPENING :

1.     SHE, THE FORMER FIRST LADY OF THE PRESIDENT OF UNITED STATES OF AMERICA, AR HER AGES 92 YEARS OLD.

2.     AMEN.

3.     PRACTICE OF ARMY, NAVY, AIR FORCE, IN THE SPOT, PLACES NEXT TO KINGMAN, MAZU ISLAND.

4.     GOOD DAYS, PEACE, REPUBLIC OF CHINA (TAIWAN), CHINA, ASIA AND WORLDWIDE.

5.     I AM: PAI-PIN CHEN, P.E.

6.     I WAS THE FORMER EMPLOYEE OF THE MOST POWERFUL, MOST THANKFUL CONSULTING ENGINEERING FIRMS: A. SYSKA & HENNESSY INC., B. JAROS BAUM BOLLES, JB&B, CONSULTING, MECHANICAL, ELECTRICAL, PLUMBING, AUTOMATION, ENGINEERING, USA, LOCAL, NATIONAL, WORLDWIDE.

7.     NOW I AM POSTING THIS VIDEO, I TOOK IN YEAR 1998.

8.     THANK YOU VERY MUCH.

II.               VIDEO, OPERA, PERFORMED AT MUSIC HALL, THU, IN JAN.1998, SYOU FEN LEE CHEN, RECORD, 04182018, POSTING.

III.             PLEASE KEEP COOL, CALM, SMART, HARD WORKING, INTELLIGENT WITH WISDOM OF YOURSELF AND LEARNED FROM THE WISDOM OF THE SAINTS, SUPER NICE PEOPLE IN THE PAST AND NOW.

IV.            HIGHLY APPRECIATED.




DOT, OPTICAL, PACIFIC RIMS, ASIA, USA AND WORLDWIDE.

MISSION CRITICAL AND ESSENTIAL WORLDWIDE SINCE YEAR 1979.

MORE NOT SHOWN AT THIS MOMENT.

PEACE PRIORITY WORLDWIDE.

CC: 陳栢彬,陳栢彬.net, 陳柏彬.com;

工程師.com; 電機技師.com;

專業工程師;中台房地產.com;

April 18, 2018, WED.

FILED.

Monday, April 16, 2018

NYSEASIA, PAI PIN CHEN ,INTERNET, IN THE LAST FEW NIGHTS, MY DREAMS BACK TO 35-40 YEARS AGO WITH STRANGE CIRCUMSTANCES,04172018.


Philip Pai-Pin Chen,P.E.

Philip Pai-Pin Chen,P.E.

Nyseasia NY

Paipin Chen.

DATE: APRIL 17, TH., TUESDAY, 2018.

PAI PIN & SYOU FEN CHEN

NYSEASIA, NYPEASIA, NYCEASIA

PAI PIN CHEN, INTERNET.

I. VIDEO, PARTIAL, SECTION 2 OF 2.

OPERA, CANDY HOUSE, THU, PERFORMED ON MAY 16TH. 2002.

MOST BEAUTIFUL.

MOST POWERFUL.

MOST WONDERFUL.

MOST THANKFUL.

THANK YOU VERY MUCH.

II. OPERA, VOICE, MUSIC AND PERFORMING ARTS, LOCAL AND WORLDWIDE.

MISSION ESSENTIAL AND CRITICAL WORLDWIDE SINCE YEAR 1971.

04172018. MPEGAV

III. KEY WORDS I AM LEARNUNG AND AWARE AS SHOWN ON TODAY AND IN THE PAST:

Epictetus (1st century A.D.) Said: Strengthen yourself with contentment,

For it is an impregnable fortress.

PS: LATELY, DAY AND NIGHT, MY IMAGES, MESSAGES INSIDE MY BRAIN, MY HEAD, WERE QUITE DIFFERENT. DAY TIME, OK, WONDERFUL; NIGHT, SHOWING, SHOWN IN THE PAST MANY YEARS AGO, ABOUT 35/45 YEARS AGO, THE PEOPLE, AROUND ME WERE STRANGE ,WILD, UN-STABLE, JUMPING UP-DOWN QUICKLY, UN-KNOWN, MOST STRANGERS AND I DID’T KNOW WHO ARE THEY, AND WHAT KIND OF BUSSINESS OR SERVICES THEY WERE DOING IN THE MY DREAMS IN THE LAST FEW DAYS.

……..

LET ME WORKING ON CURRENTLY AND SEE THESE KINDS OF MY STRANGE DREAMS WILL BE DISAPEARED FROM MY DREAMS IN THE NIGHTS IN THE COMING DAYS.

THANKS.

PAIPIN CHEN.

NYSEASA@GMAIL.COM

NYSEASIA@AOL.COM

NYSEASIA@HOTMAIL.COM

NYSEASIACHEN@YAHOO.COM

IEEEMOBIPPCPE@GMAIL.COM

NYCCHINA888@YAHOO.COM

DOTOPTICAL@YAHOO.COM.TW

PAIPINCHEN.COM

CHENPAIPIN.COM

NYSEASIAWORLD.COM

CC: 陳栢彬,陳栢彬.net, 陳柏彬.com;

工程師.com; 電機技師.com;

專業工程師;中台房地產.com;

FILED.

Thursday, April 12, 2018

TEN PAGES OF WORDS, WITH THE DRAFT OF CERTAIN FIELDS, SEE CAN BE POSTED IN HERE, THANKS SINCE YEAR 2007 WITH YOU. 04122018,CHECKING.

PLEASE NOTE:
THE POSTING NOT FOR ANY PURPOSES.
DRAFT, REVISED AND UPDATED REQUIRED.
THANKS.
10 PAGES, MORE OR LESS.
SEE AND CHECKING.

Date: July 29, 2015

Philip Pai-Pin Chen

Please note:

These information Original, Wrote, Copy and shown in year 1999-2000, and posted in year 2007, Materials shown below not for any purposes.

“Words shown to be reviewed and checked again-if you interested”.

Thanks-Philip Pai-Pin Chen

Draft:

“NOT For Construction”.

Revised and updated required.

Attention please:

I.                  Please contact me via nyseasia@gmail.com and concerns for your coming and existing projects, local, national and worldwide.

MissionCritical.com

FaceEssential.com.

NYEssential.com

BateryAssociates.com

Mechanical & Electrical Engineering, Professionals and consultants, USA, Asia & Worldwide.

II.                Materials shown below Not for any purposes.

III.               Thanks- Philip Pai-Pin Chen-dated on February 21, 2015.

April 9th, 2007(First issued in year 2007 or later)

Can we get there from here?

Do right things, Do things right! Do right time!

 Hi! Guys, gals, & Folks, and me too!

IEEE.mobi, NYSEASIA US.

Subject: “M&E Design Data Bank”

RE: Gen.Set

HVAC questionnaire to be issued to Electrical Department

Project:

Date:

HVAC Project Engineer:

Electrical Project Engineer:

A.            Engine

1.            Engine Generator Capacity (full load KW)

2.            Type of Engine:

a.            Gas.

b.            Diesel.

c.            Turbine.

d.            Other.

3.            Engine generator make design will be based on:

4.            Engine generator overall sizes:

a.            Length:

b.            Width:

c.            Height:

5.            Number of engines generators working simultaneously:

B.             Fuel System

1.            Is transfer pump part of and mounted on engine?

a.            Max. Total suction head (ft) (lift and line resistance)

b.            Capacity (gpm)

2.            a.   Is day tank part of engine:

c.            size:

d.            Controls furnished with day tank:

(1)            High Alarm

(2)            Pump Off.

(3)            Pump on.

(4)            Low Alarm.

e.            Pipe connection sizes:

(1)            Suction.

(2)            Return.

(3)            Overflow (if Required).

3.            Day tank furnished separately:

4.            Size per engine (gal)

5.            Fuel oil pumping rate per engine.

6.            Type of fuel.

7.            Other:

C.            Radiator

1.            Radiator & fan mounted on engine block skid (engine drives radiator fan).

a.            Comes all inter-connecting piping between radiator & engine with the unit.

b.            If not what external piping has to be furnished?

c.            Are vibration isolators for engine block skid to be furnished separately?

2.            Radiator and fan remotely located from engine (but in same room).

a.            Radiator cooling water pipe connecting sizes.

b.            Cooling water flow:   gpm

c.            Location of radiator.

d.            Radiator make design will be based on:

3.            Radiator and fan remotely located from engine (outside of engine room).

a.            Location.

b.            Elevation of radiator in relation to engine (ft.).

c.            Radiator cooling water pipe connecting sizes.

d.            Cooloing water flow (gpm).

4.            What equipment is part of radiator?

a.            Surge tank.

b.            Ventiline from radiator to surge tank.

c.            Vacuum breaker.

d.            Thermometer wells.

e.            If surge tank is not part of radiator furnished by radiator manufacturer what size is required?

D.            COOLING WATER SYSTEM

1.            Volume

a.            Engine only (gall.)

b.            Radiator for max. ambient of 110 deg. F.

c.            Radiator for max. ambient of 125Deg. F. (gal).

2.            Water pump performance (pump furnished with engine).

a.            Is pump mounted on the engine.

b.            Jacket water

(1)   capacity at     ft.. (gal)

(2).   Capacity at    ft.

(4)            Maximum allowable static head (ft).

(5)            Cooling water pipe connecting sizes.

(6)            Internal pressure drop through equipment.

3.            Auxiliary water

a.            Lub oil cooler.

(1)   Capacity at    ft.   (gal).

(2)                Capacity at 0 ft  (gal).

(3)                Max. allowable static head (ft).

(4)                Cooling water pipe connecting sizes.

(5)                Internal pressure drop through equpment (ft).

         b.,   Other (     )

              (1)   Capacity at    ft.  (gal).

(2)            Capacity at 0 ft .  (gal).

              (3).   Max. allowable static head (ft).

(3)            Cooling water pipe connecting sizes.

(4)            Internal pressure drop through equipment (ft).

4.            Maximum system pressure (psi).

a.            Water jacket.

b.            After cooler.

c.            Radiator.

d.            Lub oil cooler.

e.            Other (   )

5.            Can heat exchange be mounted on the engine and be part of it?

a.            Size.

b.            Capacity.

c.            Connecting pipe sizes.

E.             Heat Rejection

1.            To jacket water (including standard mainfold, after cooler, oil cooler )

(Btu/min)

2.            Maximum jacket water temperature (Deg.F).

3.            Radiator data

a.            Air flow through radiator with air entering radiator at:

(1)            95Deg.F  (CFM)

(2)            105 Deg.F. (CFM)

(3)            110 Deg.F. (CFM)

(4)            120 Deg.F (CFM)

l      HVAC design guide calls for 110deg. F. entering temperature when radiator is in the same room as tne engine.

b.            Maximum allowable external static pressure at discharge side of radiator (in”).

F.             ENGINE ROOM VENTILATION REQUIREMENTS

1.            COMBUSTION AIR REQUIREMENTS AT 85Deg.F.

2.            Heat radiated by engine   (btu/min)

3.            Heat dissipated by generator (Btu/min).

4.            Ventilation requirements (based on 15Deg F. Delta T) (CFM) (engine and generator radiated heat only).

G.            EXHAUST SYSTEM

1.            Gas Volume  (CFM).

2.            Gas temperature (Deg.F).

3.            Max. permissible back pressure (in).

4.            Exhaust pipe size connection at engine.

5.            Exhaust pipe size based on:

a.                                ft straight horizontal pipe.

b.                                Ft vertical pipe.

c.                                Elbows.

6.            Muffler Data

a.            Size.

b.            Weight.

c.            Flexible Connection (by whom).

7.            Exhaust stack size bases on:

a.                number of engines operating simultaneously.

b.                    Ft straight  horizontal pipe.

c.                Ft   vertical pipe.

d.                Elbows.

8.            Crank-case breather vent piping.

a.                connecting size at engine.

b.                Pipe size.

H.            DIESEL LUBRICATING SYSTEM REQUIREMENTS

1.            Is pump mounted on engine and part of package?

a.            Pump Capacity:

(1)             gpm.

(2)             Head (ft)

2.            Flow gpm.

3.            External pipe size requirements.

4.            Storage or reservoir capacity (gal)

I.               STARTING SYSTEM

1.            Air system.

a.            Min. air pressure required at motor (psi).

b.            Max. air pressure allowed at motor (psi).

2.            Others.

_________________________________________________________

Subject: M&E Design Data Bank

Re: Em. Gen. Set

__________________________________________________________

1.            GENERAL

The intent of this Design Guide is to outline the procedure to follow in designing standby power plants for use as an alternate source of power in the event of failure of the normal electrical service. It does not cover other alternate sources of power which may be required or permitted by Code (i.e., battery system, tapping ahead of main switches of two separate services, etc.). Costs are also not included as they will vary with each project.

2.            CRITERIA

a.            Tabulate the load which is to be on the emergency system. Include the following:

(1)            Minimum emergency loads required or recommended by Code:

(2)            Emergency loads required for standby power plant auxiliary equipment, including:

(3)            ADDITIONAL EMERGENCY LOADS REQUESTED BY Owner.

(4)            Additional emergency loads recommended by Consultants, PPC/ADSC and approved by Owner.

                                    

b.            List the sum of loads from 'a" above as follows:

_____________________________________________________

EMERGENCY LOADS  HP  KW  P.F.  KVA  D.F.  DEMAND

                                                 KVA

______________________________________________________

(a).Sum of incandescent            1.0

lighting loads

(b).Sum of electrical                1.0

heating loads

©. Sum of fluorescent

and mercury loads                  .9

(d). Individual motor

loads (2)

TOTALS

            Conn. HP:    

                     Conn. KW:    

                               Conn. KVA:   

                                         Demand KVA:     

___________________________________________________________

Notes:

(1)            Power factors for motors normally vary from .80 to .95.

(2)            List only the largest motors that are to operate on emergency simultaneously.

(3)            HP x .746/ Motor Efficency = KW; KW/P.F. =KVA;

KVA x D.F. = Demand KVA

P.F. (System) = KW ( Conn. )/ KVA ( Conn. )

c.            Using the demand KVA and system power factors obtained in 'b" above, select the generator as fellows:

(1).   Add spare (as required).

(3)              Subtract any loads included in 'b' which will be put on emergency manually only when the load conditions allow it (selective loading).

(4)             Select next higher size generator (continuous rating) available from at least three of the base bid manufacturers listed.

(a)            Ideal.

(b)            Electric Machinery

(c)            Delco.

(d)            G.E.

(e)            Century.

(f)              Westinghouse.

             (5).   Using selected generator, calculate voltage dip due to starting of single motor, ( or simultaneous starting of group of motors) with largest locked rotor KVA. Use manufacturer's tables for calculating dip. If dip exceeds 5%, recalculate based on next higher generator size or investigate use of reduced voltage starters on the motors.

             (6).    Determine generator output voltage by weighing the following factors:

(a)            Normal operating voltage(s) of equipment on emergency.

(b)            Cost, space and weight of transformers.

(c)            Cost of, and spare required for , distributing wiring.

             (7).    Size generator 3 phase main fused switch or circuit breaker as follows:

(a)            Continuous current rating:

I = KVA Gen./(1.732 x E Gen. Line to Line)

(b)            Interrupting Rating: Determine from generator manufacturer maximum three phase fault current available and rate accordingly.

             (8).   Generator grounding : For normal applications , directly

                   grounded wye connection and frame of generator to cold

                   water main or driven ground rods. Where generator line to

                   ground fault current exceeds three phase fault current

                   either:

(a)            Specify generator capable application of withstanding greater fault current and increase interrupting rating of generator  main fused switch or circuit breaker accordingly, or

(b)            Furnish a low-value reactor or resistor in ground conductor which will limit line to ground fault current to a value between 25% and 100% of three phase fault current.

(9)            Check Code regulations on generators:

(a)             Taichung, Taiwan: Article ?

(b)            Taiwan :  NFPA # ?, Article ?

(c)             National: NFPA #? , Article ?

d.              Select engine as follows:

(1)     Determine type of engine and fuel to be specified, using the following as a guide:

     (a).   Diesel engine:  Most commonly used, most familiar to maintenance engineers, large selection of sizes. Howerever, require inertia block. Specifify at highest speed available in order to reduce weight weight and cost. Specify for use with #2 diesel oil (lowest sulphur content fuel commonly available).

(c)            Gasoline Engine:

(d)            Natural Gas:

(e)            Turbine:

(2)   Determine basic engine BHP required for selected  Generator units.

IEEE.MOBI, PAI-PIN CHEN

@ Dot, Optical Pacific Rim, Asia

Jan.03, 2007(FIRST ISSUED).

July 29, 2015, 2015 (third issued).

Filled. ieeemobippcpeAT Dotcom, nyseasiaworldwide.com.

Email: nyseasia@hotmail.com.NYSEASIA NY,Broad, NY, USA etc.